WELL · 42-211-30259 · DISTRICT 10

Pablo #4034

Plugged

Hemphill County · Mendota NW. (Granite Wash) field  · Vertical

Pablo #4034 (API 42-211-30259) is a plugged well in Hemphill County, plugged September 26, 2024, last operated by Pablo Energy II LLC.

The RRC has issued one drilling permit, issued January 30, 1997, permitted to 11,500 ft.

It was permitted by Pablo Energy, Inc. and has since transferred to Pablo Energy II LLC on the wellbore schedule.

Completion filings report one formation top, including Granite Wash.

Its 2 leases have reported 6.3K barrels of oil and 245K mcf of gas since November 1997, last reporting in September 2024. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Pablo Energy II LLC

Permitted by Pablo Energy, Inc.; the EWA schedule now lists a different operator.

Amarillo, TX · P-5 Y, filed Oct 4, 2025 · (806) 662-0101

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePablo Energy II LLC
Production reportsPablo Energy II, LLCthrough Feb 2024
Latest permitPablo Energy, Inc.Jan 30, 1997

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,500
total depth, ft
1
permits on file
Jan 30, 1997
last permit issued
Dec 16, 1997
completed
6.3K
cumulative oil, bbl
245K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 1997 THROUGH Sep 2024

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 16, 1997
Shut in
—
Plugged
Sep 26, 2024

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Pablo G-14-202435Mendota, NW. (Granite Wash)Pablo Energy II, LLC10118KMay 2004 – Sep 2024
Pablo O-14-7238Mendota, NW. (Granite Wash)Pablo Energy, Inc.16.3K126KNov 1997 – Nov 2005

Gas, mcf lease total

Last 12 months 0 · prior 12 0

0100200202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Pablo Energy, Inc.Nov 1997 → Dec 2005
  2. 2Pablo Energy II, LLCJan 2006 → Feb 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
457895-99ReenterPablo Energy, Inc.Jan 28, 1997Jan 30, 1997Dec 9, 199711,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-14-202435————
—— O-14-7238————

Formation tops

As filed on W-2/G-1. Subsea from 2,625 ft elevation.Download CSV →

FormationMD ftSubsea
Granite WashGRANITE WASH "O"10,084-7,459
Granite WashGRANITE WASH -O-10,084-7,459
Granite WashGRANITE WASH "B"10,614-7,989
Granite WashGRANITE WASH -B-10,614-7,989
Granite WashGRANITE WASH "B"10,788-8,163
Granite WashGRANITE WASH -B-10,788-8,163

Perforations

Perforated and open-hole intervals.

FromToType
10,08410,102Perforated
10,61410,628Perforated
10,64810,696Perforated
10,78810,810Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6252,85012.251,750 S
5.510,9957.875190 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 14, 2004May 25, 2004—
00Jul 27, 2004——
00Feb 5, 1998Jan 12, 1998Yes
00Jan 27, 1998——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21130259, documented in the API reference.