WELL · 42-211-30653 · DISTRICT 10

Wilson Bertha E. Unit #1

Plugged

Hemphill County · Feldman (Tonkawa) field  · Vertical

Wilson Bertha E. Unit #1 (API 42-211-30653) is a plugged well in Hemphill County, plugged June 21, 2017, last operated by Strat Land Exploration Company.

The RRC has issued 2 drilling permits between 2003 and 2005, permitted to 11,960 ft.

Completion filings report 5 formation tops, including Brn Dolomite, Douglas, Tonkawa, Cleveland.

Operator of record

Strat Land Exploration Company

Tulsa, OK · P-5 Y, filed Nov 4, 2022 · 607 permits on file · (806) 435-7292

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleStrat Land Exploration Company
Production reportsJCB II Enterprises, LLCthrough Oct 2014
Latest permitStrat Land Exploration CompanyFeb 18, 2005

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,960
total depth, ft
2
permits on file
Feb 18, 2005
last permit issued
Apr 2, 2004
completed
0
cumulative oil, bbl
813K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jun 2017

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 2, 2004
Shut in
—
Plugged
Jun 21, 2017

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Wilson, Bertha E. Unit G-14-211341Feldman (Atoka)JCB II Enterprises, LLC1093.7KAug 2005 – Jun 2017
Wilson, Bertha E. Unit G-14-201074Feldman (Tonkawa)Strat Land Exploration Company10262Apr 2004 – Aug 2005
Wilson, Bertha E. Unit G-14-71392Feldman (Morrow Lower)Tri-EX Petroleum, L.P.10720KJan 1993 – Apr 2004

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Brock Oil & Gas CorporationJan 1993 → Sep 2000
  2. 2Key Energy of Colorado, Inc.Feb 2001 → Mar 2001
  3. 3Tri-EX Petroleum, L.P.Apr 2004 → May 2004
  4. 4Strat Land Exploration CompanyAug 2005 → Mar 2006
  5. 5JCB II Enterprises, LLCNov 2007 → Oct 2014

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
557373-99RecompletionStrat Land Exploration CompanyFeb 7, 2005Feb 18, 2005—11,960
534747-99RecompletionTri-EX Petroleum, L.P.Jul 29, 2003Aug 21, 2003Dec 2, 200311,537

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-14-71392————
—— G-14-201074————
—— G-14-211341————

Formation tops

As filed on W-2/G-1. Subsea from 2,689 ft elevation.Download CSV →

FormationMD ftSubsea
BRN Dolomite3,918-1,229
Douglas6,930-4,241
Tonkawa7,592-4,903
Tonkawa7,593-4,904
Cleveland8,724-6,035
Atoka10,336-7,647

Perforations

Perforated and open-hole intervals.

FromToType
7,6177,619Perforated
7,6227,624Perforated
7,6327,636Perforated
7,6447,660Perforated
10,39610,410Perforated
11,53811,554Perforated
11,67011,538Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.375550—320 S
8.6253,233—1,900 S
5.511,169—265 F

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 5, 2005Sep 12, 2005Yes
00Oct 10, 2005——
00Jun 24, 2004Apr 27, 2004Yes
00May 20, 2004——
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21130653, documented in the API reference.