WELL · 42-211-30865 · DISTRICT 10

Federal -161- #161-2

N

Hemphill County · Mathers Ranch (Tonkawa) field  · Vertical

Federal -161- #161-2 (API 42-211-30865) is a well in Hemphill County operated by Makar Production Company, completed August 27, 1977.

The RRC has issued one drilling permit, issued August 31, 1977, permitted to 8,000 ft.

It was permitted by Amarex, Inc. and has since transferred to Makar Production Company on the wellbore schedule.

Completion filings report 3 formation tops, including Brown Dolomite, Douglas, Tonkawa.

Its 2 leases have reported 2.99K barrels of oil and 314K mcf of gas since January 1993, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Makar Production Company

Permitted by Amarex, Inc.; the EWA schedule now lists a different operator.

Graham, TX · P-5 Y, filed Mar 4, 2026 · 1 permits on file · (806) 683-8283

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMakar Production Company
Production reportsMakar Production Companythrough Apr 2026
Latest permitAmarex, Inc.Aug 31, 1977

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,000
total depth, ft
1
permits on file
Aug 31, 1977
last permit issued
Aug 27, 1977
completed
2.99K
cumulative oil, bbl
314K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 27, 1977
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Federal -161- G-14-293261Mathers Ranch (Tonkawa)Makar Production Company102.51KSep 2022 – Jul 2026
Federal -161- O-14-4235Mathers Ranch (Tonkawa)Makar Production Company12.99K311KJan 1993 – Jul 2023

Gas, mcf lease total

Last 12 months 1,142 · prior 12 427(+167%)

0200400600202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1TGX CorporationJan 1993 → Feb 1993
  2. 2Axis Energy CorporationMar 1993 → Dec 2015
  3. 3Occidental Energy Company, Inc.Jan 2002 → Sep 2006
  4. 4Makar Production CompanyFeb 2017 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
605-99DrillAmarex, Inc.Aug 31, 1977Aug 31, 1977Jun 22, 19778,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-14-293261————
—— O-14-4235————

Formation tops

As filed on W-2/G-1. Subsea from 2,364 ft elevation.Download CSV →

FormationMD ftSubsea
Brown Dolomite3,870-1,506
DouglasDOUGLAS SAND7,224-4,860
Tonkawa7,924-5,560

Perforations

Perforated and open-hole intervals.

FromToType
7,9267,932Perforated
7,9267,948Perforated
7,9407,948Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,03011450 S
8.6251,030—450 S
2.3757,881——
5.57,9997.875250 S
5.57,999—250 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 13, 2022Sep 15, 2022Yes
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21130865, documented in the API reference.