WELL · 42-211-31012 · DISTRICT 10
Campbell #2
Hemphill County · Red Deer Creek (Morrow Upper) field · Vertical
Campbell #2 (API 42-211-31012) is a plugged well in Hemphill County, plugged May 21, 1999, last operated by Questa Energy Corporation.
The RRC has issued 2 drilling permits between 1978 and 1996, permitted to 12,000 ft.
Completion filings report one formation top, including Granite Wash.
Operator of record
Amarillo, TX · P-5 Y, filed Feb 4, 2026 · 52 permits on file · (806) 358-6549
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Questa Energy Corporation |
| Production reports | Questa Energy Corporationthrough Nov 1996 |
| Latest permit | Questa Energy CorporationApr 2, 1996 |
- 12,000
- total depth, ft
- 2
- permits on file
- Apr 2, 1996
- last permit issued
- Jan 15, 1979
- completed
- 0
- cumulative oil, bbl
- 10.3K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Sep 1999
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 15, 1979
- Shut in
- —
- Plugged
- May 21, 1999
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Campbell G-14-81238 | Red Deer Creek (Morrow, Upper) | Questa Energy Corporation | 1 | 0 | 9.09K | Jan 1993 – Sep 1999 |
| Campbell G-14-158208 | Canadian, SW. (Granite Wash) | Questa Energy Corporation | 1 | 0 | 1.23K | Feb 1996 – May 1999 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Meridian Oil Inc.Jan 1993 → Mar 1994
- 2Questa Energy CorporationFeb 1996 → Nov 1996
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 446000-99 | Recompletion | Questa Energy Corporation | Mar 27, 1996 | Apr 2, 1996 | Mar 27, 1994 | 10,825 |
| 27878-99 | Drill | EL Paso Natural Gas Co. | Jul 3, 1978 | Jul 3, 1978 | Oct 27, 1978 | 12,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-81238 | — | — | — | — |
| — | — G-14-158208 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,573 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Granite Wash | 9,770 | -7,197 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,146 | 10,778 | Perforated |
| 11,633 | 11,638 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 97 | — | — |
| 9.625 | 2,925 | 12.25 | 1,600 S |
| 9.625 | 2,925 | — | 1,600 S |
| 7 | 11,738 | — | 465 S |
| 7 | 11,738 | 8.75 | 530 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 14, 1998 | Feb 17, 1998 | — |
| 00 | Jun 18, 1996 | Mar 15, 1996 | Yes |
| 00 | May 31, 1996 | — | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-211-31012 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-211-31012 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/21131012, documented in the API reference.