WELL · 42-211-31174 · DISTRICT 10
Flowers #1-39
Hemphill County · Vertical
Flowers #1-39 (API 42-211-31174) is a plugged well in Hemphill County, plugged December 18, 1979, last operated by Cambridge & Nail.
The RRC has issued 2 drilling permits between 1979 and 1982, permitted to 7,700 ft.
Operator of record
Amarillo, TX · P-5 Y, filed Nov 8, 1991 · 59 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Devon Louisiana Corporationthrough Aug 2005 |
| Latest permit | Cambridge & NailMar 10, 1982 |
- 7,700
- total depth, ft
- 2
- permits on file
- Mar 10, 1982
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 185K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jun 2017
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Dec 18, 1979
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Flowers G-14-103099 | Canadian, SE (Douglas) | Tecolote Energy Operating, LLC | 1 | 0 | 185K | Jan 1993 – Jun 2017 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Cambridge Production, Inc.Jan 1993 → Jan 1998
- 2Spring Resources, Inc.Feb 1998 → Dec 1999
- 3St. Johns Operating #1 L.P.Jan 2000 → May 2003
- 4Peak Operating of Texas, LLCJun 2003 → Sep 2004
- 5Devon Louisiana CorporationJan 2005 → Aug 2005
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 153310-99 | Other | Cambridge & Nail | Mar 10, 1982 | Mar 10, 1982 | — | 7,700 |
| 65564-99 | Drill | Moody Energy Co. | Nov 15, 1979 | Nov 15, 1979 | Nov 30, 1979 | 7,623 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-103099 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,297 | 7,405 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,614 | 12.25 | 1,000 S |
| 2.375 | 7,243 | — | — |
| 4.5 | 7,612 | 7.875 | 200 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Nov 16, 1982 | — |
| 00 | Jan 12, 1984 | May 7, 1982 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-211-31174 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-211-31174 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/21131174, documented in the API reference.