WELL · 42-211-31262 · DISTRICT 10
Wright John T. Sec. -116- #1
Hemphill County · Canadian SE (Douglas) field · Vertical
Wright John T. Sec. -116- #1 (API 42-211-31262) is a plugged well in Hemphill County, plugged July 23, 2020, last operated by Makar Production Company.
The RRC has issued one drilling permit, issued August 25, 1980, permitted to 7,550 ft.
It was permitted by Moody Energy CO. and has since transferred to Makar Production Company on the wellbore schedule.
Operator of record
Permitted by Moody Energy Co.; the EWA schedule now lists a different operator.
Graham, TX · P-5 Y, filed Mar 4, 2026 · 1 permits on file · (806) 683-8283
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Makar Production Company |
| Production reports | Makar Production Companythrough Mar 2020 |
| Latest permit | Moody Energy Co.Aug 25, 1980 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,550
- total depth, ft
- 1
- permits on file
- Aug 25, 1980
- last permit issued
- Oct 6, 1980
- completed
- 0
- cumulative oil, bbl
- 202K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2020
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 6, 1980
- Shut in
- —
- Plugged
- Jul 23, 2020
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Wright, John T. Sec. -116- G-14-90604 | Canadian, SE (Douglas) | Makar Production Company | 1 | 0 | 202K | Jan 1993 – Jul 2020 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Parallel Petroleum CorporationJan 1993 → Jan 1998
- 2Spring Resources, Inc.Feb 1998 → Dec 1999
- 3St. Johns Operating #1 L.P.Jan 2000 → Jan 2001
- 4Upland Resources, Inc.Feb 2001 → Dec 2007
- 5Granite Operating CompanyJan 2008 → Apr 2012
- 6Apache CorporationMay 2012 → Jun 2012
- 7Axis Energy CorporationJul 2012 → Apr 2016
- 8Makar Production CompanyMay 2016 → Mar 2020
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 90843-99 | Drill | Moody Energy Co. | Aug 25, 1980 | Aug 25, 1980 | Aug 30, 1980 | 7,550 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-90604 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,346 | 7,380 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,560 | 12.25 | 950 S |
| 2.375 | 7,210 | — | — |
| 4.5 | 7,658 | 7.875 | 225 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Oct 22, 1980 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-211-31262 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-211-31262 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/21131262, documented in the API reference.