WELL · 42-211-31588 · DISTRICT 10
Nix #1
Hemphill County · Vertical
Nix #1 (API 42-211-31588) is a plugged well in Hemphill County, plugged June 4, 2018, last operated by Naumann Oil & Gas, Inc..
The RRC has issued 5 drilling permits (amended once) between 1982 and 1996, permitted to 7,500 ft.
Completion filings report 3 formation tops, including Brown Dolomite, Heebner, Douglas.
Operator of record
Austin, TX · P-5 Y, filed Jun 4, 2026 · 70 permits on file · (432) 638-5050
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Texas Mississippi Energy, LLCthrough May 2014 |
| Latest permit | Naumann Oil & Gas, Inc.Oct 9, 1996 |
- 7,500
- total depth, ft
- 6
- permits on file
- Oct 9, 1996
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 721K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Dec 1996 THROUGH May 2018
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Jun 4, 2018
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Nix G-14-162374 | Canadian, NW (Douglas) | Texas Mississippi Energy, LLC | 1 | 0 | 721K | Dec 1996 – May 2018 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Naumann Oil & Gas, Inc.Jan 1997 → Jan 2009
- 2Overflow Energy, LLCOct 2009 → Jul 2012
- 3Texas Mississippi Energy, LLCDec 2012 → May 2014
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 453481-99 | Reenter | Naumann Oil & Gas, Inc. | Oct 4, 1996 | Oct 9, 1996 | Nov 10, 1996 | 7,302 |
| 366079-99 | Reenter | TXO Production Corp. | Nov 6, 1989 | Apr 30, 1990 | — | 7,500 |
| 337404-98 | Reenter | TXO Production Corp. | Jul 5, 1988 | Oct 14, 1987 | — | 7,500 |
| 337404-99 | Reenter | TXO Production Corp. | Oct 14, 1987 | Oct 14, 1987 | — | 7,500 |
| 195976-99 | Drill | Diamond Chemicals Company | May 4, 1983 | May 4, 1983 | — | 7,300 |
| 165534-99 | Drill | Diamond Chemicals Company | Jun 25, 1982 | Jun 25, 1982 | — | 7,302 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-162374 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,504 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Brown Dolomite | 3,708 | -1,204 |
| Heebner | 6,620 | -4,116 |
| Douglas | 6,710 | -4,206 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,710 | 6,785 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,579 | 12.25 | 1,250 S |
| 4.5 | 7,026 | 7.875 | 300 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 30, 1997 | Feb 12, 1997 | Yes |
| 00 | Apr 10, 1997 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-211-31588 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-211-31588 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/21131588, documented in the API reference.