WELL · 42-211-31799 · DISTRICT 10

Lockhart 27 #2

N

Hemphill County · Jones (Morrow Upper) field  · Vertical

Lockhart 27 #2 (API 42-211-31799) is a well in Hemphill County operated by Woods Petroleum Corporation, completed December 21, 1985.

The RRC has issued one drilling permit, issued October 24, 1985, permitted to 11,550 ft.

Completion filings report 7 formation tops, including Douglas, Tonkawa, Cleveland, Granite Wash.

Its 2 leases have reported 9.79K barrels of oil and 4.84M mcf of gas since January 1993, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Woods Petroleum Corporation

Dallas, TX · P-5 Y, filed Oct 15, 1990 · 143 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWoods Petroleum Corporation
Production reportsChesapeake Operating, L.L.C.through Jun 2016
Latest permitWoods Petroleum CorporationOct 24, 1985

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,550
total depth, ft
1
permits on file
Oct 24, 1985
last permit issued
Dec 21, 1985
completed
9.79K
cumulative oil, bbl
4.84M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 21, 1985
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Lockhart -27- G-14-150162Humphreys, N.W. (Morrow Upper)Unbridled Resources, LLC104.23MMay 1994 – Jul 2026
Lockhart -27- O-14-6356Humphreys, N.W. (Morrow Upper)Sonat Exploration Company19.79K613KJan 1993 – Apr 1996

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Sonat Exploration CompanyJan 1993 → Jul 1994
  2. 2Sonat Exploration Company-MCRAug 1994 → Dec 1999
  3. 3EL Paso Production CompanyJan 2000 → Apr 2003
  4. 4Chesapeake Operating, Inc.May 2003 → Oct 2014
  5. 5Chesapeake Operating, L.L.C.Nov 2014 → Jun 2016

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
288549-99DrillWoods Petroleum CorporationFeb 7, 1986Oct 24, 1985Nov 13, 198511,550

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-14-150162————
—— O-14-6356————

Formation tops

As filed on W-2/G-1. Subsea from 2,592 ft elevation.Download CSV →

FormationMD ftSubsea
Douglas7,124-4,532
Douglas7,134-4,542
Tonkawa7,780-5,188
Cleveland8,969-6,377
Granite WashGRANITE WASH CONGLO.9,968-7,376
Granite WashGRANITE WASH CONGLOMERATE9,968-7,376
Granite Washconglomerate9,968-7,376
13 Finger Lime10,877-8,285
MorrowUPPER MORROW11,227-8,635

Perforations

Perforated and open-hole intervals.

FromToType
11,22811,252Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6253,03212.251,450 S
5.511,1007.875960 S
2.87511,5004.7570 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 4, 1994May 31, 1994—
00Jul 29, 1994——
00Sep 29, 1986Jul 28, 1986—
00Sep 24, 1986——
00Aug 7, 1986Jul 28, 1986—
00Mar 3, 1986Jan 13, 1986Yes
00Feb 27, 1986Feb 10, 1986—
00Feb 25, 1986——
00Feb 20, 1986Jan 13, 1986Yes
00Jan 27, 1986Jan 13, 1986Yes
00Jan 24, 1986——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21131799, documented in the API reference.