WELL · 42-211-31802 · DISTRICT 14

Dan #2

N

Hemphill County  · Vertical

Dan #2 (API 42-211-31802) is a former disposal or injection well in Hemphill County, last operated by Capstone Cactus Operating Comp.; its UIC permit is no longer active.

The RRC has issued 2 drilling permits between 1985 and 2009, permitted to 16,000 ft.

Operator of record

Capstone Cactus Operating Comp.

Hennessey, OK · P-5 Y, filed Apr 4, 2026 · 2 permits on file · (405) 853-7170

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitCapstone Cactus Operating Comp.Apr 30, 2009
16,000
total depth, ft
2
permits on file
Apr 30, 2009
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
680659-99ReenterCapstone Cactus Operating Comp.Apr 23, 2009Apr 30, 2009—5,100
289020-99DrillMustang Production CompanySep 5, 1985Oct 22, 1985Dec 2, 198516,000

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Feb 2020
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000100845W-14 DisposalCanceled Mar 6, 202320,0001,0004,400–4,750

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120192020

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21131802, documented in the API reference.