WELL · 42-211-31854 · DISTRICT 10
Trust #1
Hemphill County · Vertical
Trust #1 (API 42-211-31854) is a permitted well in Hemphill County filed by Unit Petroleum Company; no completion report is on file yet.
The RRC has issued 2 drilling permits between 1986 and 2010, permitted to 11,600 ft.
Completion filings report 6 formation tops, including Brown Dolomite, Tonkawa, Cleveland, Cherokee Sand.
Its 2 leases have reported 10.4K barrels of oil and 1.52M mcf of gas since January 1993, last reporting in February 2018. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Tulsa, OK · P-5 Y, filed Dec 4, 2025 · 1,100 permits on file · (918) 493-7700
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Unit Petroleum Companythrough Apr 2007 |
| Latest permit | Unit Petroleum CompanyApr 28, 2010 |
- 11,600
- total depth, ft
- 2
- permits on file
- Apr 28, 2010
- last permit issued
- —
- completed
- 10.4K
- cumulative oil, bbl
- 1.52M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Feb 2018
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Trust G-14-172171 | Sixty Six (Morrow, Upper) | Unit Petroleum Company | 1 | 0 | 537K | Dec 1998 – Feb 2018 |
| Trust O-14-6430 | Sixty Six (Morrow, Upper) | Unit Petroleum Company | 1 | 10.4K | 980K | Jan 1993 – Jun 2000 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Unit Petroleum CompanyJan 1993 → Apr 2007
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 694835-99 | Recompletion | Unit Petroleum Company | Apr 21, 2010 | Apr 28, 2010 | — | 11,600 |
| 324837-99 | Drill | Unit Drilling & Expl. Co. | Dec 29, 1986 | Dec 31, 1986 | — | 11,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-172171 | — | — | — | — |
| — | — O-14-6430 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,580 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Brown Dolomite | 4,180 | -1,600 |
| Tonkawa | 7,800 | -5,220 |
| Cleveland | 8,984 | -6,404 |
| Cherokee Sand | 10,465 | -7,885 |
| 13 Finger | 11,020 | -8,440 |
| MorrowLOWER MORROW | 11,256 | -8,676 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 11,259 | 11,265 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 2,893 | 12.25 | 990 S |
| 5.5 | 11,134 | 8.5 | 250 S |
| 2.875 | 11,569 | 4.5 | 100 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 30, 1999 | Jan 19, 1999 | — |
| 00 | Mar 25, 1999 | — | — |
| 00 | May 18, 1987 | Apr 13, 1987 | Yes |
| 00 | May 12, 1987 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-211-31854 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-211-31854 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.