WELL · 42-211-31962 · DISTRICT 10
Urschel #4049
Hemphill County · Twister (Douglas) field · Vertical
Urschel #4049 (API 42-211-31962) is a plugged well in Hemphill County, plugged February 1, 2021, last operated by Lone Star Oil & Gas.
The RRC has issued one drilling permit, issued August 14, 1991, permitted to 8,550 ft.
It was permitted by Maxus Exploration Company and has since transferred to Lone Star Oil & Gas on the wellbore schedule.
Completion filings report 3 formation tops, including Pl, Douglas, L/Douglas.
Operator of record
Permitted by Maxus Exploration Company; the EWA schedule now lists a different operator.
Midland, TX · P-5 Y, filed Oct 4, 2025 · 24 permits on file · (432) 686-9390
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Lone Star Oil & Gas |
| Production reports | Crescendo Resources, L.P.through Jun 1999 |
| Latest permit | Maxus Exploration CompanyAug 14, 1991 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 8,550
- total depth, ft
- 1
- permits on file
- Aug 14, 1991
- last permit issued
- Dec 18, 1992
- completed
- 0
- cumulative oil, bbl
- 155K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jan 2021
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 18, 1992
- Shut in
- —
- Plugged
- Feb 1, 2021
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Urschel G-14-144140 | Twister (Douglas) | Lone Star Oil & Gas | 1 | 0 | 155K | Jan 1993 – Jan 2021 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Maxus Exploration CompanyJan 1993 → Jan 1995
- 2Midgard Energy CompanyFeb 1995 → Sep 1997
- 3Crescendo Resources, L.P.Oct 1997 → Jun 1999
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 390895-99 | Drill | Maxus Exploration Company | Aug 14, 1991 | Aug 14, 1991 | Nov 4, 1992 | 8,550 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-144140 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,484 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| PL | 2,996 | -512 |
| Douglas | 6,914 | -4,430 |
| L/Douglas | 7,176 | -4,692 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,962 | 6,996 | Perforated |
| 7,028 | 7,044 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,617 | 12.25 | 800 S |
| 4.5 | 7,346 | 7.875 | 539 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 15, 1993 | Jan 8, 1993 | Yes |
| 00 | Mar 8, 1993 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-211-31962 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-211-31962 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/21131962, documented in the API reference.