WELL · 42-211-32003 · DISTRICT 10
Campbell #151A
Hemphill County · Vertical
Campbell #151A (API 42-211-32003) is a plugged well in Hemphill County, plugged March 10, 1993, last operated by Bracken Energy Company.
The RRC has issued 2 drilling permits between 1992 and 1995, permitted to 10,500 ft.
Completion filings report 4 formation tops, including Brown Dolomite, Base Heebner, Douglas, Granite Wash.
Operator of record
Oklahoma City, OK · P-5 Y, filed Feb 9, 1996 · 55 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | none |
| Latest permit | Bracken Energy CompanyJun 30, 1995 |
- 10,500
- total depth, ft
- 2
- permits on file
- Jun 30, 1995
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Sep 1995 THROUGH Dec 1995
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Mar 10, 1993
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Campbell G-14-156164 | Canadian, SW. (Granite Wash) | Bracken Energy Company | 1 | 0 | 0 | Sep 1995 – Dec 1995 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 437349-99 | Reenter | Bracken Energy Company | Jun 28, 1995 | Jun 30, 1995 | Aug 15, 1995 | 10,500 |
| 406915-99 | Drill | Bracken Energy Company | Dec 7, 1992 | Dec 23, 1992 | — | 7,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-156164 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,606 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Brown Dolomite | 4,010 | -1,404 |
| Base Heebner | 7,072 | -4,466 |
| Douglas | 7,090 | -4,484 |
| Granite Wash | 10,006 | -7,400 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,200 | 10,224 | Perforated |
| 10,322 | 10,386 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,624 | 12.25 | 750 S |
| 4.5 | 10,500 | 7.875 | 300 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 2, 1996 | Nov 10, 1995 | Yes |
| 00 | Dec 8, 1995 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-211-32003 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-211-32003 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/21132003, documented in the API reference.