WELL · 42-211-32006 · DISTRICT 10

Howe Ranch #4

Y

Hemphill County · Howe Ranch (Morrow UP) field · Producing  · Vertical

Howe Ranch #4 (API 42-211-32006) is a well in Hemphill County operated by Bce-Mach Iii LLC, completed August 25, 1994 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued February 11, 1993, permitted to 12,650 ft.

It was permitted by Graham Royalty, Ltd. and has since transferred to Bce-Mach Iii LLC on the wellbore schedule.

Completion filings report 5 formation tops, including B/Heebner, Kansas City, Cleveland, Granite Wash.

No lease production has been reported under this well’s leases.

Operator of record

Bce-Mach III LLC

Permitted by Graham Royalty, Ltd.; the EWA schedule now lists a different operator.

Oklahoma City, OK · P-5 Y, filed Mar 4, 2026 · 10 permits on file · (833) 831-2164

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBce-Mach III LLC
Production reportsCimarex Energy Co. of Coloradothrough Jul 2018
Latest permitGraham Royalty, Ltd.Feb 11, 1993

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,650
total depth, ft
1
permits on file
Feb 11, 1993
last permit issued
Aug 25, 1994
completed
0
cumulative oil, bbl
1.92M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 1994 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 25, 1994
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Howe Ranch G-14-151104Howe Ranch (Morrow UP)Bce-Mach III LLC101.92MAug 1994 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Midpar L.P.Aug 1994 → Feb 1995
  2. 2Parker & Parsley Development L.PMar 1995 → Aug 1997
  3. 3Pioneer Natural Res. USA, Inc.Sep 1997 → Jun 1999
  4. 4Prize Operating CompanyJul 1999 → Mar 2002
  5. 5Gruy Petroleum Management Co.Apr 2002 → Apr 2006
  6. 6Cimarex Energy Co. of ColoradoMay 2006 → Jul 2018

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
408236-99DrillGraham Royalty, Ltd.Jan 19, 1993Feb 11, 1993May 27, 199412,650

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-14-151104————

Formation tops

As filed on W-2/G-1. Subsea from 2,248 ft elevation.Download CSV →

FormationMD ftSubsea
B/Heebner7,232-4,984
Kansas City8,988-6,740
Cleveland9,361-7,113
Granite Wash10,308-8,060
Morrow12,227-9,979

Perforations

Perforated and open-hole intervals.

FromToType
12,38912,394Perforated
12,38912,459Perforated
12,40312,403Perforated
12,40912,420Perforated
12,43112,431Perforated
12,45412,459Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37536017.5450 S
8.6252,71212.25200 S
5.512,3027.875465 S
5.512,302——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 22, 1995Feb 24, 1995—
00Oct 19, 1994Sep 21, 1994Yes
00Oct 4, 1994——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21132006, documented in the API reference.