WELL · 42-211-32091 · DISTRICT 10
Campbell #2058
Hemphill County · Canadian SE (Douglas) field · Vertical
Campbell #2058 (API 42-211-32091) is a plugged well in Hemphill County, plugged December 14, 2011, last operated by Bracken Operating L.L.C..
The RRC has issued one drilling permit, issued October 25, 1994, permitted to 7,600 ft.
It was permitted by Bracken Energy Company and has since transferred to Bracken Operating L.L.C. on the wellbore schedule.
Completion filings report 3 formation tops, including Brown Dolomite, Base Heebner, Douglas.
Operator of record
Permitted by Bracken Energy Company; the EWA schedule now lists a different operator.
Perryton, TX · P-5 Y, filed Dec 4, 2025 · 140 permits on file · (806) 228-0138
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Bracken Operating L.L.C. |
| Production reports | Bracken Operating, L.L.C.through Dec 2010 |
| Latest permit | Bracken Energy CompanyOct 25, 1994 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,600
- total depth, ft
- 1
- permits on file
- Oct 25, 1994
- last permit issued
- Dec 11, 1994
- completed
- 0
- cumulative oil, bbl
- 2.52M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Dec 1994 THROUGH May 2012
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 11, 1994
- Shut in
- —
- Plugged
- Dec 14, 2011
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Campbell G-14-152891 | Canadian, SE (Douglas) | Bracken Operating, L.L.C. | 1 | 0 | 2.52M | Dec 1994 – May 2012 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Bracken Energy CompanyMar 1995 → Mar 1996
- 2Bracken Operating, L.L.C.Apr 1996 → Dec 2010
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 429301-99 | Drill | Bracken Energy Company | Oct 21, 1994 | Oct 25, 1994 | Nov 6, 1994 | 7,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-152891 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,779 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Brown Dolomite | 4,250 | -1,471 |
| Base Heebner | 7,384 | -4,605 |
| Douglas | 7,440 | -4,661 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,471 | 7,476 | Perforated |
| 7,486 | 7,490 | Perforated |
| 7,510 | 7,514 | Perforated |
| 7,516 | 7,518 | Perforated |
| 7,522 | 7,525 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,605 | 12.25 | 850 S |
| 4.5 | 7,610 | 7.875 | 230 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 16, 1995 | Feb 10, 1995 | Yes |
| 00 | Mar 2, 1995 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-211-32091 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-211-32091 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/21132091, documented in the API reference.