WELL · 42-211-32288 · DISTRICT 10

McQuiddy #1

Plugged

Hemphill County · Canadian SE (Douglas) field  · Vertical

Mcquiddy #1 (API 42-211-32288) is a plugged well in Hemphill County, plugged May 23, 2014, last operated by Capstone Cactus Operating Comp..

The RRC has issued one drilling permit, issued March 30, 1998, permitted to 8,400 ft.

It was permitted by Canyon Exploration CO. and has since transferred to Capstone Cactus Operating Comp. on the wellbore schedule.

Completion filings report 2 formation tops, including Douglas, Tonkawa.

Operator of record

Capstone Cactus Operating Comp.

Permitted by Canyon Exploration Co.; the EWA schedule now lists a different operator.

Hennessey, OK · P-5 Y, filed Apr 4, 2026 · 2 permits on file · (405) 853-7170

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCapstone Cactus Operating Comp.
Production reportsEngine & Compressor Services Incthrough May 2005
Latest permitCanyon Exploration Co.Mar 30, 1998

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,400
total depth, ft
1
permits on file
Mar 30, 1998
last permit issued
Jul 3, 1998
completed
0
cumulative oil, bbl
24.7K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 1998 THROUGH May 2014

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 3, 1998
Shut in
—
Plugged
May 23, 2014

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
McQuiddy G-14-170137Canadian, SE (Douglas)Capstone Cactus Operating Comp.1024.7KJul 1998 – May 2014

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Canyon Exploration Co.Jul 1998 → Aug 2001
  2. 2Arrington CJM, Inc.Sep 2001 → Jun 2002
  3. 3Engine & Compressor Services IncJul 2002 → May 2005

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
474850-99DrillCanyon Exploration Co.Mar 30, 1998Mar 30, 1998Apr 4, 19988,400

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-14-170137————

Formation tops

As filed on W-2/G-1. Subsea from 2,409 ft elevation.Download CSV →

FormationMD ftSubsea
DouglasDOUGLAS SANDSTONE7,332-4,923
TonkawaTONKAWA SANDSTONE8,042-5,633

Perforations

Perforated and open-hole intervals.

FromToType
7,3357,341Perforated
7,3507,368Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,64812.25720 S
4.58,1967.87550 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 12, 1998Aug 19, 1998Yes
00Nov 9, 1998Jul 15, 1998—
00Oct 7, 1998——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21132288, documented in the API reference.