WELL · 42-211-32288 · DISTRICT 10
McQuiddy #1
Hemphill County · Canadian SE (Douglas) field · Vertical
Mcquiddy #1 (API 42-211-32288) is a plugged well in Hemphill County, plugged May 23, 2014, last operated by Capstone Cactus Operating Comp..
The RRC has issued one drilling permit, issued March 30, 1998, permitted to 8,400 ft.
It was permitted by Canyon Exploration CO. and has since transferred to Capstone Cactus Operating Comp. on the wellbore schedule.
Completion filings report 2 formation tops, including Douglas, Tonkawa.
Operator of record
Capstone Cactus Operating Comp.
Permitted by Canyon Exploration Co.; the EWA schedule now lists a different operator.
Hennessey, OK · P-5 Y, filed Apr 4, 2026 · 2 permits on file · (405) 853-7170
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Capstone Cactus Operating Comp. |
| Production reports | Engine & Compressor Services Incthrough May 2005 |
| Latest permit | Canyon Exploration Co.Mar 30, 1998 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 8,400
- total depth, ft
- 1
- permits on file
- Mar 30, 1998
- last permit issued
- Jul 3, 1998
- completed
- 0
- cumulative oil, bbl
- 24.7K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jul 1998 THROUGH May 2014
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 3, 1998
- Shut in
- —
- Plugged
- May 23, 2014
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| McQuiddy G-14-170137 | Canadian, SE (Douglas) | Capstone Cactus Operating Comp. | 1 | 0 | 24.7K | Jul 1998 – May 2014 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Canyon Exploration Co.Jul 1998 → Aug 2001
- 2Arrington CJM, Inc.Sep 2001 → Jun 2002
- 3Engine & Compressor Services IncJul 2002 → May 2005
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 474850-99 | Drill | Canyon Exploration Co. | Mar 30, 1998 | Mar 30, 1998 | Apr 4, 1998 | 8,400 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-170137 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,409 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,335 | 7,341 | Perforated |
| 7,350 | 7,368 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,648 | 12.25 | 720 S |
| 4.5 | 8,196 | 7.875 | 50 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 12, 1998 | Aug 19, 1998 | Yes |
| 00 | Nov 9, 1998 | Jul 15, 1998 | — |
| 00 | Oct 7, 1998 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-211-32288 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-211-32288 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/21132288, documented in the API reference.