WELL · 42-211-32303 · DISTRICT 14

Dodd SWD #2

WaterN

Hemphill County  · Vertical

Dodd Swd #2 (API 42-211-32303) is a former disposal or injection well in Hemphill County, last operated by Forest Oil Corporation; its UIC permit is no longer active.

The RRC has issued 2 drilling permits between 1998 and 2008, permitted to 14,700 ft.

Operator of record

Forest Oil Corporation

Houston, TX · P-5 Y, filed Sep 11, 2015 · 1,861 permits on file · (866) 520-0402

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitForest Oil CorporationOct 15, 2008
14,700
total depth, ft
2
permits on file
Oct 15, 2008
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
668104-99ReenterForest Oil CorporationAug 1, 2008Oct 15, 2008—6,500
477473-99DrillSpring Resources, Inc.Jun 26, 1998Aug 3, 1998Sep 10, 199814,700

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Jun 2010
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000099732W-14 DisposalCanceled Sep 27, 201020,0002,2004,585–6,300

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120092010

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21132303, documented in the API reference.