WELL · 42-211-32546 · DISTRICT 10
Jarvis Billy #3
Hemphill County · Canadian SE. (Morrow Up.) field · Temp Abandoned · Vertical
Jarvis Billy #3 (API 42-211-32546) is a well in Hemphill County operated by Mountainside Energy Operating L, completed January 14, 2002 and listed as temp abandoned on the RRC schedule.
The RRC has issued one drilling permit, issued August 17, 2001, permitted to 12,200 ft.
It was permitted by Apache Corporation and has since transferred to Mountainside Energy Operating L on the wellbore schedule.
Completion filings report 3 formation tops, including Douglas, Granite Wash, Morrow.
No lease production has been reported under this well’s leases.
Operator of record
Mountainside Energy Operating L
Permitted by Apache Corporation; the EWA schedule now lists a different operator.
Dallas, TX · P-5 Y, filed Jan 21, 2026 · (855) 906-6868
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Mountainside Energy Operating L |
| Production reports | Chevron U. S. A. Inc.through Jul 2013 |
| Latest permit | Apache CorporationAug 17, 2001 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 12,200
- total depth, ft
- 1
- permits on file
- Aug 17, 2001
- last permit issued
- Jan 14, 2002
- completed
- 0
- cumulative oil, bbl
- 809K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 2002 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jan 14, 2002
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Jarvis, Billy G-14-187307 | Canadian, SE. (Morrow, Up.) | Mountainside Energy Operating, L | 1 | 0 | 809K | Jan 2002 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Chevron U. S. A. Inc.Jan 2002 → Jul 2013
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 512729-99 | Drill | Apache Corporation | Aug 17, 2001 | Aug 17, 2001 | Nov 8, 2001 | 12,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-187307 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,789 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Douglas | 7,337 | -4,548 |
| Granite Wash | 10,232 | -7,443 |
| Morrow | 11,748 | -8,959 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 11,980 | 12,025 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 700 | 17.5 | 905 S |
| 8.625 | 6,006 | 12.25 | 815 S |
| 5.5 | 12,231 | 7.875 | 560 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 8, 2002 | Feb 7, 2002 | Yes |
| 00 | Mar 8, 2002 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-211-32546 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-211-32546 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/21132546, documented in the API reference.