WELL · 42-211-32619 · DISTRICT 10
Kelly #2106
Hemphill County · Canadian NW. (Morrow Lo.) field · Vertical
Kelly #2106 (API 42-211-32619) is a plugged well in Hemphill County, plugged July 24, 2025, last operated by Unbridled Resources LLC.
The RRC has issued one drilling permit, issued August 15, 2002, permitted to 11,740 ft.
It was permitted by Washita Oil And Gas, L.L.C. and has since transferred to Unbridled Resources LLC on the wellbore schedule.
Completion filings report 2 formation tops, including Douglas, Morrow.
Operator of record
Permitted by Washita Oil and Gas, L.L.C.; the EWA schedule now lists a different operator.
Oklahoma City, OK · P-5 Y, filed Sep 4, 2025 · 6 permits on file · (844) 507-5540
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Unbridled Resources LLC |
| Production reports | Unbridled Resources, LLCthrough Oct 2024 |
| Latest permit | Washita Oil and Gas, L.L.C.Aug 15, 2002 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 11,740
- total depth, ft
- 1
- permits on file
- Aug 15, 2002
- last permit issued
- Dec 21, 2002
- completed
- 0
- cumulative oil, bbl
- 1.07M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Dec 2002 THROUGH Oct 2025
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 21, 2002
- Shut in
- —
- Plugged
- Jul 24, 2025
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Kelly G-14-193362 | Canadian, NW. (Morrow, Lo.) | Unbridled Resources, LLC | 1 | 0 | 1.07M | Dec 2002 – Oct 2025 |
Gas, mcf lease total
Last 12 months 0 · prior 12 272(-100%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Washita Oil and Gas, L.L.C.Dec 2002 → Sep 2004
- 2Chesapeake Operating, Inc.Oct 2004 → Oct 2014
- 3Chesapeake Operating, L.L.C.Nov 2014 → Jun 2016
- 44P Energy Texas, LLCJul 2016 → Oct 2020
- 5Unbridled Resources, LLCNov 2020 → Oct 2024
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 521987-99 | Drill | Washita Oil and Gas, L.L.C. | Jul 18, 2002 | Aug 15, 2002 | Sep 15, 2002 | 11,740 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-193362 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,943 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 11,662 | 11,686 | Open hole |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 2,724 | 12.25 | 1,345 S |
| 5.5 | 11,634 | 7.875 | 260 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 7, 2003 | Jan 27, 2003 | Yes |
| 00 | Mar 18, 2003 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-211-32619 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-211-32619 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/21132619, documented in the API reference.