WELL · 42-211-32734 · DISTRICT 10
Meek J. P. #5069
Hemphill County · Buffalo Wallow (Granite Wash) field · Temp Abandoned · Vertical
Meek J. P. #5069 (API 42-211-32734) is a well in Hemphill County operated by Mmgl Txph LLC, completed September 29, 2003 and listed as temp abandoned on the RRC schedule.
The RRC has issued one drilling permit, issued April 15, 2003, permitted to 12,000 ft.
It was permitted by PN Resources, Inc. and has since transferred to Mmgl Txph LLC on the wellbore schedule.
Completion filings report 3 formation tops, including Cleveland, Oswego, Granite Wash.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by PN Resources, Inc.; the EWA schedule now lists a different operator.
Dallas, TX · P-5 Y, filed Jun 4, 2026 · 10 permits on file · (972) 701-8377
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Mmgl Txph LLC |
| Production reports | Talon Oil & Gas LLCthrough Nov 2010 |
| Latest permit | PN Resources, Inc.Apr 15, 2003 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 12,000
- total depth, ft
- 1
- permits on file
- Apr 15, 2003
- last permit issued
- Sep 29, 2003
- completed
- 0
- cumulative oil, bbl
- 272K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Sep 2003 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Sep 29, 2003
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Meek, J. P. G-14-198460 | Buffalo Wallow (Granite Wash) | Mmgl Txph, LLC | 1 | 0 | 272K | Sep 2003 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Newfield Expl. Mid-Con. IncSep 2003 → Jun 2007
- 2Talon Oil & Gas LLCJul 2007 → Nov 2010
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 530663-99 | Drill | PN Resources, Inc. | Apr 14, 2003 | Apr 15, 2003 | Aug 22, 2003 | 12,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-198460 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,736 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Cleveland | 10,184 | -7,448 |
| Oswego | 10,491 | -7,755 |
| Granite Wash | 10,860 | -8,124 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 11,269 | 11,425 | Perforated |
| 11,507 | 11,584 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 2,820 | 12.25 | 1,640 S |
| 4.5 | 11,921 | 7.875 | 500 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 9, 2004 | Oct 28, 2003 | Yes |
| 00 | Jan 15, 2004 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-211-32734 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-211-32734 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/21132734, documented in the API reference.