WELL · 42-211-33195 · DISTRICT 10
Meek 68 #6811 P
Hemphill County · Buffalo Wallow (Granite Wash) field · Vertical
Meek 68 #6811 P (API 42-211-33195) is a plugged well in Hemphill County, plugged June 7, 2019, last operated by Eqv Operating LLC.
The RRC has issued one drilling permit, issued January 20, 2005, permitted to 13,500 ft.
It was permitted by Patina Oil & Gas Corporation and has since transferred to Eqv Operating LLC on the wellbore schedule.
Completion filings report 2 formation tops, including Oswego, Granite Wash.
Operator of record
Permitted by Patina Oil & Gas Corporation; the EWA schedule now lists a different operator.
Oklahoma City, OK · P-5 Y, filed Aug 4, 2025 · (405) 831-7443
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Eqv Operating LLC |
| Production reports | Unit Petroleum Companythrough Oct 2014 |
| Latest permit | Patina Oil & Gas CorporationJan 20, 2005 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 13,500
- total depth, ft
- 1
- permits on file
- Jan 20, 2005
- last permit issued
- Apr 10, 2005
- completed
- 0
- cumulative oil, bbl
- 216K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Apr 2005 THROUGH May 2024
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 10, 2005
- Shut in
- —
- Plugged
- Jun 7, 2019
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Meek 68 G-14-209310 | Buffalo Wallow (Granite Wash) | Eqv Operating LLC | 1 | 0 | 216K | Apr 2005 – May 2024 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Noble Energy Production, Inc.Apr 2005 → Aug 2007
- 2Noble Energy IncSep 2007 → Aug 2012
- 3Unit Petroleum CompanySep 2012 → Oct 2014
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 556367-99 | Drill | Patina Oil & Gas Corporation | Jan 18, 2005 | Jan 20, 2005 | Mar 4, 2005 | 13,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-209310 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,768 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| OswegoOSWEGO LM | 10,684 | -7,916 |
| Granite WashGRANITE WASH A-1 | 11,122 | -8,354 |
| Granite WashGRANITE WASH B | 11,305 | -8,537 |
| Granite WashGRANITE WASH C | 11,600 | -8,832 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 11,375 | 11,537 | Perforated |
| 11,614 | 11,718 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 3,215 | 12.25 | 1,375 S |
| 4.5 | 11,885 | 7.875 | 340 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 6, 2005 | Jun 13, 2005 | Yes |
| 00 | Jul 13, 2005 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-211-33195 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-211-33195 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/21133195, documented in the API reference.