WELL · 42-211-33355 · DISTRICT 10
Make Believe #2
Hemphill County · Shreikey (Granite Wash) field · Vertical
Make Believe #2 (API 42-211-33355) is a plugged well in Hemphill County, plugged December 12, 2014, last operated by Range Production Company LLC.
The RRC has issued one drilling permit (amended once), issued July 12, 2005, permitted to 12,000 ft.
It was permitted by Range Production Company and has since transferred to Range Production Company LLC on the wellbore schedule.
Completion filings report 3 formation tops, including Base Heebner, Douglas, Thirteen Fingers.
Operator of record
Permitted by Range Production Company; the EWA schedule now lists a different operator.
Fort Worth, TX · P-5 Y, filed Apr 5, 2019 · 10 permits on file · (817) 980-4254
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Range Production Company LLC |
| Production reports | Range Production Companythrough Jan 2011 |
| Latest permit | Range Production CompanyJul 12, 2005 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 12,000
- total depth, ft
- 2
- permits on file
- Jul 12, 2005
- last permit issued
- Jan 16, 2006
- completed
- 0
- cumulative oil, bbl
- 342K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 2006 THROUGH Jul 2015
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 16, 2006
- Shut in
- —
- Plugged
- Dec 12, 2014
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Make Believe G-14-216745 | Shreikey (Granite Wash) | Range Production Company, LLC | 1 | 0 | 342K | Jan 2006 – Jul 2015 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Range Production CompanyJan 2006 → Jan 2011
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 603174-98 | Drill | Range Production Company | Feb 12, 2009 | Jul 12, 2005 | Oct 10, 2005 | 12,000 |
| 603174-99 | Drill | Range Production Company | Jul 8, 2005 | Jul 12, 2005 | Oct 10, 2005 | 11,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-216745 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,647 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Base Heebner | 7,045 | -4,398 |
| Douglas | 7,144 | -4,497 |
| Thirteen Fingers | 7,730 | -5,083 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,369 | 10,760 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 2,844 | 12.25 | 1,475 S |
| 5.5 | 11,853 | 7.875 | 340 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 24, 2006 | Apr 6, 2006 | Yes |
| 00 | Jul 6, 2006 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-211-33355 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-211-33355 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/21133355, documented in the API reference.