WELL · 42-211-33441 · DISTRICT 10
Hodges #2233
Hemphill County · Buffalo Wallow (Granite Wash) field · Vertical
Hodges #2233 (API 42-211-33441) is a plugged well in Hemphill County, plugged August 13, 2012, last operated by Eagle Rock Mid-Continent OP LLC.
The RRC has issued one drilling permit, issued November 2, 2005, permitted to 14,440 ft.
It was permitted by Encore Operating, L.P. and has since transferred to Eagle Rock Mid-Continent OP LLC on the wellbore schedule.
Completion filings report 4 formation tops, including Kansas, Cleveland, Granite Wash, Granit Wash.
Operator of record
Eagle Rock Mid-Continent OP LLC
Permitted by Encore Operating, L.P.; the EWA schedule now lists a different operator.
Houston, TX · P-5 Y, filed Oct 7, 2016 · 3 permits on file · (832) 544-6815
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Eagle Rock Mid-Continent OP LLC |
| Production reports | Eagle Rock Mid-Continent OP, LLCthrough Jul 2012 |
| Latest permit | Encore Operating, L.P.Nov 2, 2005 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 14,440
- total depth, ft
- 1
- permits on file
- Nov 2, 2005
- last permit issued
- Mar 22, 2006
- completed
- 0
- cumulative oil, bbl
- 57.2K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 2006 THROUGH Dec 2012
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 22, 2006
- Shut in
- —
- Plugged
- Aug 13, 2012
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hodges G-14-216887 | Buffalo Wallow (Granite Wash) | Eagle Rock Mid-Continent OP, LLC | 1 | 0 | 57.2K | Mar 2006 – Dec 2012 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Encore Operating, L.P.Mar 2006 → May 2007
- 2Crow Creek Operating Co II LLCJun 2007 → Jul 2011
- 3Eagle Rock Mid-Continent OP, LLCAug 2011 → Jul 2012
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 608785-99 | Drill | Encore Operating, L.P. | Nov 1, 2005 | Nov 2, 2005 | Jan 2, 2006 | 14,440 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-216887 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,740 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Kansas | 9,090 | -6,350 |
| Cleveland | 10,245 | -7,505 |
| Granite Wash | 11,065 | -8,325 |
| Granit Wash | 11,065 | -8,325 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 11,006 | 12,796 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 3,150 | 12.25 | 315 S |
| 5.5 | 13,144 | 7.875 | 475 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 10, 2007 | Aug 18, 2006 | — |
| 00 | Oct 24, 2006 | Jun 14, 2006 | Yes |
| 00 | Jul 10, 2006 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-211-33441 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-211-33441 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/21133441, documented in the API reference.