WELL · 42-211-34635 · DISTRICT 10
Huff #2001
Hemphill County · Buffalo Wallow (Granite Wash) field · Temp Abandoned · Vertical
Huff #2001 (API 42-211-34635) is a well in Hemphill County operated by United Oil & Shale LLC, completed May 29, 2011 and listed as temp abandoned on the RRC schedule.
The RRC has issued one drilling permit, issued October 9, 2009, permitted to 13,750 ft.
It was permitted by Granite Operating Company and has since transferred to United Oil & Shale LLC on the wellbore schedule.
Completion filings report 5 formation tops, including Blue Shale, Douglas, Cleveland, Grws.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Granite Operating Company; the EWA schedule now lists a different operator.
Woodward, OK · P-5 Y, filed Feb 4, 2026 · (806) 440-4844
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | United Oil & Shale LLC |
| Production reports | Apache Corporationthrough Dec 2014 |
| Latest permit | Granite Operating CompanyOct 9, 2009 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 13,750
- total depth, ft
- 1
- permits on file
- Oct 9, 2009
- last permit issued
- May 29, 2011
- completed
- 0
- cumulative oil, bbl
- 244K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · May 2010 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- May 29, 2011
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: X
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Huff G-14-258660 | Buffalo Wallow (Granite Wash) | United Oil & Shale LLC | 1 | 0 | 244K | May 2010 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Granite Operating CompanyMay 2010 → Apr 2012
- 2Apache CorporationJun 2012 → Dec 2014
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 685953-99 | Drill | Granite Operating Company | Oct 8, 2009 | Oct 9, 2009 | Feb 17, 2010 | 13,750 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-258660 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,512 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 11,163 | 11,480 | Perforated |
| 11,535 | 11,935 | Perforated |
| 12,020 | 12,566 | Perforated |
| 12,695 | 12,704 | Perforated |
| 12,920 | 12,929 | Perforated |
| 13,186 | 13,195 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 2,448 | 11 | 1,366 S |
| 4.5 | 13,662 | 7.875 | 1,110 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 12, 2012 | Jul 29, 2011 | — |
| 00 | Apr 8, 2011 | Jul 6, 2010 | Yes |
| 00 | Jan 25, 2011 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-211-34635 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-211-34635 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/21134635, documented in the API reference.