WELL · 42-211-34695 · DISTRICT 10
Mendota Ranch 38 #1H
Hemphill County · Mendota NW. (Granite Wash) field · Horizontal
Mendota Ranch 38 #1H (API 42-211-34695) is a plugged horizontal well in Hemphill County, plugged November 9, 2016, last operated by Jones Energy LLC.
The RRC has issued one drilling permit, issued March 18, 2010, permitted to 15,600 ft.
It was permitted by Jones Energy, Ltd. and has since transferred to Jones Energy LLC on the wellbore schedule.
Completion filings report 3 formation tops, including Cleveland, Oswego, Granite Wash.
Operator of record
Permitted by Jones Energy, Ltd.; the EWA schedule now lists a different operator.
Oklahoma City, OK · P-5 Inactive, filed Dec 13, 2019 · 375 permits on file · (405) 534-5232
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Jones Energy LLC |
| Production reports | Jones Energy, LLCthrough Apr 2016 |
| Latest permit | Jones Energy, Ltd.Mar 18, 2010 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 15,600
- total depth, ft
- 1
- permits on file
- Mar 18, 2010
- last permit issued
- Jun 13, 2010
- completed
- 0
- cumulative oil, bbl
- 157K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jul 2010 THROUGH Jun 2020
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 13, 2010
- Shut in
- —
- Plugged
- Nov 9, 2016
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Mendota Ranch 38 G-14-265131 | Mendota, NW. (Granite Wash) | Jones Energy, LLC | 1 | 0 | 157K | Jul 2010 – Jun 2020 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Jones Energy, Ltd.Jul 2010 → Jan 2013
- 2Jones Energy, LLCFeb 2013 → Apr 2016
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 692930-99 | Drill | Jones Energy, Ltd. | Mar 16, 2010 | Mar 18, 2010 | Apr 4, 2010 | 15,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-265131 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,540 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Cleveland | 8,871 | -6,331 |
| OswegoOSWEGO UPPER | 9,193 | -6,653 |
| OswegoOSWEGO 2 | 9,611 | -7,071 |
| Granite WashUPPER GRANITE WASH | 9,715 | -7,175 |
| Granite WashGRANITE WASH A | 9,851 | -7,311 |
| Granite WashGRANITE WASH B | 10,003 | -7,463 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,490 | 14,764 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 2,021 | 17.5 | 1,965 S |
| 9.625 | 5,114 | 12.25 | 490 S |
| 7 | 10,490 | 8.75 | 110 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 5, 2012 | May 13, 2011 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-211-34695 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-211-34695 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/21134695, documented in the API reference.