WELL · 42-211-34844 · DISTRICT 10

Moore 62 #4H

Y

Hemphill County · Meg (Granite Wash) field · Producing  · Horizontal

Moore 62 #4H (API 42-211-34844) is a horizontal well in Hemphill County operated by Bce-Mach II LLC, completed April 5, 2011 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued February 9, 2011, permitted to 13,300 ft.

It was permitted by Plains Exploration & Prod. CO. and has since transferred to Bce-Mach II LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Douglas, Cleveland, Granite Wash.

No lease production has been reported under this well’s leases.

Operator of record

Bce-Mach II LLC

Permitted by Plains Exploration & Prod. Co.; the EWA schedule now lists a different operator.

Oklahoma City, OK · P-5 Y, filed Jun 4, 2026 · (833) 831-2164

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBce-Mach II LLC
Production reportsBce-Mach II LLCthrough Apr 2026
Latest permitPlains Exploration & Prod. Co.Feb 9, 2011

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

13,300
total depth, ft
2
permits on file
Feb 9, 2011
last permit issued
Apr 5, 2011
completed
0
cumulative oil, bbl
4.42M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 2011 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Apr 5, 2011
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Moore 62 G-14-262262Meg (Granite Wash)Bce-Mach II LLC104.42MApr 2011 – Jul 2026

Gas, mcf lease total

Last 12 months 81,099 · prior 12 92,467(-12%)

05K10K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Latigo Petroleum, Inc.Apr 2011 → Jan 2012
  2. 2Plains Exploration & Prod. Co.Feb 2012 → Mar 2012
  3. 3Linn Operating, Inc.Apr 2012 → Dec 2014
  4. 4Enervest Operating, L.L.C.Jan 2015 → Aug 2019
  5. 5Bce-Mach II LLCSep 2019 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
709779-98DrillPlains Exploration & Prod. Co.Feb 9, 2012Feb 9, 2011Feb 10, 201113,300
709779-99DrillLatigo Petroleum, Inc.Feb 7, 2011Feb 9, 2011Feb 10, 201113,300

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-14-262262————

Formation tops

As filed on W-2/G-1. Subsea from 2,315 ft elevation.Download CSV →

FormationMD ftSubsea
Douglas5,982-3,667
Cleveland8,964-6,649
Granite Wash10,441-8,126

Perforations

Perforated and open-hole intervals.

FromToType
11,30011,569Perforated
11,69911,968Perforated
12,09812,367Perforated
12,49712,766Perforated
12,89613,165Perforated
13,29513,564Perforated
13,69413,963Perforated
14,09314,362Perforated
14,49214,761Perforated
14,89115,160Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,62013.51,005 S
7.62510,2019.8751,555 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 6, 2012Jun 6, 2011Yes
00Feb 23, 2012May 5, 2011Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21134844, documented in the API reference.