WELL · 42-211-34851 · DISTRICT 10

Brainard 25 #1H

N

Hemphill County · Horse Creek SE. (Cleveland) field  · Horizontal

Brainard 25 #1H (API 42-211-34851) is a horizontal well in Hemphill County operated by Axis Energy Corporation, completed April 19, 2011.

The RRC has issued one drilling permit (amended once), issued February 23, 2011, permitted to 9,000 ft.

Completion filings report 4 formation tops, including Cottage Grove, Hogshooter, Checker Board, Cleveland.

Its 2 leases have reported 122K barrels of oil and 437K mcf of gas since April 2011, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.

Operator of record

Axis Energy Corporation

Roswell, NM · P-5 Y, filed Nov 4, 2025 · 26 permits on file · (575) 622-4182

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAxis Energy Corporation
Production reportsBE Anadarko II, LLCthrough Apr 2026
Latest permitAxis Energy CorporationFeb 23, 2011

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,000
total depth, ft
2
permits on file
Feb 23, 2011
last permit issued
Apr 19, 2011
completed
122K
cumulative oil, bbl
437K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 2011 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 19, 2011
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Brainard 25 O-14-8500Lipscomb, S.E. (Cleveland)BE Anadarko II, LLC276.4K316KDec 2011 – Jul 2026
Brainard 25 O-14-8499Horse Creek, SE. (Cleveland)Axis Energy Corporation145.1K121KApr 2011 – Sep 2012

Gas, mcf lease total

Last 12 months 7,230 · prior 12 6,056(+19%)

01K2K202420252026

Oil, barrels lease total

Last 12 months 290 · prior 12 466(-38%)

050100150202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Axis Energy CorporationApr 2011 → Dec 2011
  2. 2LE Norman Operating LLCJan 2012 → Mar 2013
  3. 3Sabine Oil & Gas LLCApr 2013 → Nov 2013
  4. 4Jones Energy, LLCDec 2013 → Dec 2019
  5. 5Revolution Operating Company,llcAug 2021 → Mar 2024
  6. 6BE Anadarko II, LLCApr 2024 → Jan 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
710284-98DrillAxis Energy CorporationJun 21, 2012Feb 23, 2011Mar 9, 20119,000
710284-99DrillAxis Energy CorporationFeb 14, 2011Feb 23, 2011Mar 9, 20118,275

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-14-8499————
—— O-14-8500————

Formation tops

As filed on W-2/G-1. Subsea from 2,627 ft elevation.Download CSV →

FormationMD ftSubsea
Cottage Grove7,845-5,218
Hogshooter8,107-5,480
Checker Board8,262-5,635
ClevelandCLEVELAND SAND8,328-5,701

Perforations

Perforated and open-hole intervals.

FromToType
8,78412,750Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,23512.251,200 S
78,7538.75335 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 13, 2012May 3, 2011Yes
00Sep 12, 2012May 3, 2011Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21134851, documented in the API reference.