WELL · 42-211-34940 · DISTRICT 10

Moore Family Farms SWD #1046

WaterY

Hemphill County · Buffalo Wallow (Granite Wash) field · Injection  · Vertical

Moore Family Farms Swd #1046 (API 42-211-34940) is a well in Hemphill County operated by Edh Disposals LLC, completed September 28, 2011 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued August 29, 2011, permitted to 5,500 ft.

It was permitted by Forest Oil Corporation and has since transferred to Edh Disposals LLC on the wellbore schedule.

Completion filings report one formation top, including Brown Dolomite.

No lease production has been reported under this well’s leases.

It holds an active disposal or injection permit, with 97.3K barrels injected in the 12 months reported through June 2025.

Operator of record

Edh Disposals LLC

Permitted by Forest Oil Corporation; the EWA schedule now lists a different operator.

Oklahoma City, OK · P-5 Y, filed Mar 4, 2026 · (405) 529-6577

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEdh Disposals LLC
Production reportsnone
Latest permitForest Oil CorporationAug 29, 2011

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,500
total depth, ft
1
permits on file
Aug 29, 2011
last permit issued
Sep 28, 2011
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Sep 2011 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Sep 28, 2011
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Delinquent

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Moore Family Farms SWD O-14-8570Buffalo Wallow (Granite Wash)Edh Disposals LLC100Sep 2011 – Jul 2026

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
723264-99DrillForest Oil CorporationAug 29, 2011Aug 29, 2011Sep 18, 20115,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-14-8570————

Formation tops

As filed on W-2/G-1. Subsea from 2,532 ft elevation.Download CSV →

FormationMD ftSubsea
Brown Dolomite4,314-1,782
Brown Dolomite5,170-2,638

Perforations

Perforated and open-hole intervals.

FromToType
4,6204,650Perforated
4,6205,170Perforated
4,6704,700Perforated
4,7204,900Perforated
4,8384,897Perforated
4,9205,000Perforated
5,0305,080Perforated
5,1505,170Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.7545212.25490 S
10.7545214.75490 S
75,5109.87590 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 11, 2022Jan 14, 2022—
00Feb 18, 2020Aug 30, 2019—
00Jul 2, 2013Feb 25, 2013—
00Jan 7, 2013Mar 27, 2012—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

97.3K
bbl, last 12 reported months
12M
bbl, all reported
Jun 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000103857W-14 DisposalActive10,0001,0004,400–5,200

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 97,318 · prior 12 287,179(-66%)

020K40K60K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21134940, documented in the API reference.