WELL · 42-213-30037 · DISTRICT 5
Ogu (Asher W. D. -1) #87
Henderson County · Opelika (Travis Peak) field · Vertical
Ogu (Asher W. D. -1) #87 (API 42-213-30037) is a plugged well in Henderson County, plugged June 17, 2022, last operated by EP Operating Limited Partnership.
The RRC has issued one drilling permit, issued May 5, 1994, permitted to 8,950 ft.
Completion filings report one formation top, including Rodessa.
Operator of record
EP Operating Limited Partnership
Dallas, TX · P-5 Y, filed Sep 2, 1995 · 194 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | EP Operating Limited Partnership |
| Production reports | XTO Energy Inc.through Oct 2009 |
| Latest permit | EP Operating Limited PartnershipMay 5, 1994 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 8,950
- total depth, ft
- 1
- permits on file
- May 5, 1994
- last permit issued
- Aug 10, 1972
- completed
- 0
- cumulative oil, bbl
- 801K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jun 2022
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 10, 1972
- Shut in
- —
- Plugged
- Jun 17, 2022
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Ogu (Asher, W.D. -1) G-5-149650 | Opelika (Rodessa) | XTO Energy Inc. | 1 | 0 | 776K | May 1994 – Jun 2022 |
| Ogu (Asher, W. D. -1) G-5-53594 | Opelika (Travis Peak) | EP Operating Limited Partnership | 1 | 0 | 25.2K | Jan 1993 – May 1994 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1EP Operating Limited PartnershipJan 1993 → Feb 1995
- 2Enserch Exploration, IncMar 1995 → Mar 1998
- 3Eex CorporationApr 1998 → Apr 1998
- 4Cross Timbers Operating CompanyMay 1998 → May 2001
- 5XTO Energy Inc.Jun 2001 → Oct 2009
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 423405-99 | Recompletion | EP Operating Limited Partnership | Apr 28, 1994 | May 5, 1994 | Apr 28, 1994 | 8,950 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-5-53594 | — | — | — | — |
| — | — G-5-149650 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 420 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Rodessa | 8,960 | -8,540 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,036 | 8,239 | Perforated |
| 9,021 | 10,043 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,291 | 12.5 | 700 S |
| 8.625 | 1,292 | 12.25 | — |
| 4.5 | 10,399 | 7.875 | 1,050 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 18, 1994 | Jun 2, 1994 | Yes |
| 00 | Jun 27, 1994 | — | — |
| 00 | Jan 12, 1984 | Oct 18, 1972 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-213-30037 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-213-30037 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/21330037, documented in the API reference.