WELL · 42-213-30313 · DISTRICT 5

Arnold Billy #1

Plugged

Henderson County · Rowe & Baker (Paluxy) field  · Vertical

Arnold Billy #1 (API 42-213-30313) is a plugged well in Henderson County, plugged September 21, 2010, last operated by Guffey Roy Oil Company.

The RRC has issued 3 drilling permits between 1980 and 2013, permitted to 5,100 ft.

It was permitted by Gemini Energy, Inc. and has since transferred to Guffey Roy Oil Company on the wellbore schedule.

Completion filings report 5 formation tops, including B/Austin, T/Woodbine, Woodbine, Paluxy.

Its 2 leases have reported 13.3K barrels of oil and 51 mcf of gas since January 1993, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Guffey Roy Oil Company

Permitted by Gemini Energy, Inc.; the EWA schedule now lists a different operator.

Dallas, TX · P-5 Y, filed Feb 3, 2012 · 43 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleGuffey Roy Oil Company
Production reportsGemini Energy, Inc.through Mar 2026
Latest permitGemini Energy, Inc.Dec 13, 2013

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,100
total depth, ft
3
permits on file
Dec 13, 2013
last permit issued
Jan 18, 1981
completed
13.3K
cumulative oil, bbl
51
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 18, 1981
Shut in
—
Plugged
Sep 21, 2010

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Arnold, Billy O-5-2825Rowe & BakerWideman, Ronald16.06K51Jan 1993 – Jul 2026
Arnold, Billy O-5-4140Rowe & Baker (Paluxy)Gemini Energy, Inc.17.27K0Apr 2014 – Jul 2026

Oil, barrels lease total

Last 12 months 15 · prior 12 4(+275%)

0204060202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Hamilton, RodneyJan 1993 → Apr 1994
  2. 2J-Car Operating, Inc.May 1994 → Dec 1996
  3. 3Gemini Energy, Inc.May 2014 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
774497-99ReenterGemini Energy, Inc.Nov 25, 2013Dec 13, 2013Dec 23, 20135,075
281798-99RecompletionGuffey, Roy, Oil CompanyJul 22, 1985Aug 5, 1985—5,075
101730-99DrillMidroc Operating CompanyDec 11, 1980Dec 11, 1980—5,100

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-5-2825————
—— O-5-4140————

Formation tops

As filed on W-2/G-1. Subsea from 360 ft elevation.Download CSV →

FormationMD ftSubsea
B/Austin2,753-2,393
T/Woodbine3,182-2,822
Woodbine3,182-2,822
Paluxy4,882-4,522
T/Paluxy4,882-4,522

Perforations

Perforated and open-hole intervals.

FromToType
3,6453,658Perforated
3,7433,751Perforated
4,8824,884Perforated
4,8824,885Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62512312.2575 S
2.8754,800——
5.55,0757.875685 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 5, 2015May 22, 2014—
00May 2, 1988Mar 7, 1988—
00Mar 11, 1988Feb 8, 1988—
00Sep 13, 1985Jul 23, 1985—
00Sep 7, 1985——
00Jan 12, 1984Feb 23, 1981—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21330313, documented in the API reference.