WELL · 42-213-30333 · DISTRICT 5
Yarbee #3
Henderson County · Trinidad S. (Rodessa) field · Vertical
Yarbee #3 (API 42-213-30333) is a plugged well in Henderson County, plugged January 11, 2022, last operated by John P. Bogdanich Operating LLC.
The RRC has issued one drilling permit, issued September 8, 1981, permitted to 7,600 ft.
It was permitted by Par Oil Corp. and has since transferred to John P. Bogdanich Operating LLC on the wellbore schedule.
Its 2 leases have reported 1 barrels of oil and 80.5K mcf of gas since January 1993, last reporting in March 2022. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
John P. Bogdanich Operating LLC
Permitted by Par Oil Corp.; the EWA schedule now lists a different operator.
Kilgore, TX · P-5 Y, filed May 4, 2026 · 1 permits on file · (801) 808-6030
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | John P. Bogdanich Operating LLC |
| Production reports | Green River Resources Inc.through Oct 1997 |
| Latest permit | Par Oil Corp.Sep 8, 1981 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,600
- total depth, ft
- 1
- permits on file
- Sep 8, 1981
- last permit issued
- —
- completed
- 1
- cumulative oil, bbl
- 80.5K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2022
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Jan 11, 2022
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Yarbee O-5-3586 | Trinidad, S. (Rodessa) | John P. Bogdanich Operating, LLC | 1 | 1 | 0 | Oct 1997 – Mar 2022 |
| Yarbee G-5-96670 | Trinidad, S. (Rodessa) | Green River Resources Inc. | 1 | 0 | 80.5K | Jan 1993 – Oct 1998 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Par Minerals CorporationJan 1993 → Oct 1996
- 2Green River Resources Inc.Nov 1996 → Oct 1997
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 132519-99 | Drill | Par Oil Corp. | Sep 8, 1981 | Sep 8, 1981 | Oct 16, 1981 | 7,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-5-96670 | — | — | — | — |
| — | — O-5-3586 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,358 | 7,368 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 608 | 12.25 | 270 S |
| 2.375 | 7,272 | — | — |
| 5.5 | 7,452 | 7.875 | 235 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 31, 1997 | Dec 3, 1997 | — |
| 00 | Dec 23, 1997 | — | — |
| 00 | Jan 12, 1984 | Dec 7, 1981 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-213-30333 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-213-30333 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/21330333, documented in the API reference.