WELL · 42-213-30463 · DISTRICT 5
Sheppard #1
Henderson County · Trinidad S. (Rodessa) field · Vertical
Sheppard #1 (API 42-213-30463) is a plugged well in Henderson County, plugged September 21, 1994, last operated by Green River Resources Inc..
The RRC has issued one drilling permit, issued December 14, 1984, permitted to 7,850 ft.
It was permitted by Par Minerals Corporation and has since transferred to Green River Resources Inc. on the wellbore schedule.
Completion filings report 5 formation tops, including Pecan Gap, Austin Chalk, Woodbine, Buda.
Its lease has reported 13.7K barrels of oil and 16.5K mcf of gas since January 1993, last reporting in July 2015. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Par Minerals Corporation; the EWA schedule now lists a different operator.
Keystone, CO · P-5 Y, filed Oct 4, 2025 · 1 permits on file · (903) 812-7930
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Green River Resources Inc. |
| Production reports | Green River Resources Inc.through May 2006 |
| Latest permit | Par Minerals CorporationDec 14, 1984 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,850
- total depth, ft
- 1
- permits on file
- Dec 14, 1984
- last permit issued
- Feb 23, 1985
- completed
- 13.7K
- cumulative oil, bbl
- 16.5K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2015
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Feb 23, 1985
- Shut in
- —
- Plugged
- Sep 21, 1994
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Sheppard O-5-2748 | Trinidad, S. (Rodessa) | Green River Resources Inc. | 2 | 13.7K | 16.5K | Jan 1993 – Jul 2015 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Par Minerals CorporationJan 1993 → Jan 1996
- 2Green River Resources Inc.Feb 1996 → May 2006
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 261150-99 | Drill | Par Minerals Corporation | Feb 25, 1985 | Dec 14, 1984 | Jan 20, 1985 | 7,850 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-5-2748 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 345 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Pecan Gap | 2,309 | -1,964 |
| Austin Chalk | 3,781 | -3,436 |
| Woodbine | 4,125 | -3,780 |
| Buda | 4,908 | -4,563 |
| Glen Rose | 6,340 | -5,995 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,620 | 7,624 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 630 | 12.25 | 220 S |
| 4.5 | 7,829 | 7.875 | 360 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 10, 1985 | Mar 8, 1985 | — |
| 00 | Apr 9, 1985 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-213-30463 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-213-30463 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/21330463, documented in the API reference.