WELL · 42-213-30511 · DISTRICT 5

Grier #1C

Plugged

Henderson County · Martha JO (Travis Peak) field  · Vertical

Grier #1C (API 42-213-30511) is a plugged well in Henderson County, plugged May 9, 2005, last operated by Txo Production Corp..

The RRC has issued one drilling permit (amended once), issued June 26, 1985, permitted to 11,000 ft.

Completion filings report 5 formation tops, including Bac, Woodbine, Paluxy, Rodessa.

Its 2 leases have reported 56.6K barrels of oil and 311K mcf of gas since January 1993, last reporting in August 2005. The leases carry 3 wells, so these are lease totals, not this well alone.

Operator of record

TXO Production Corp.

Dallas, TX · P-5 Y, filed Sep 1, 1992 · 3,227 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTXO Production Corp.
Production reportsNadel and Gussman, L.L.C.through Oct 2004
Latest permitTXO Production Corp.Jun 26, 1985

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,000
total depth, ft
2
permits on file
Jun 26, 1985
last permit issued
Oct 15, 1985
completed
56.6K
cumulative oil, bbl
311K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2005

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 15, 1985
Shut in
—
Plugged
May 9, 2005

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Grier O-5-2953Martha JO (Travis Peak)Nadel and Gussman, L.L.C.356.6K311KJan 1993 – Aug 2005
— G-5-122153——000—

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Marathon Oil CompanyJan 1993 → Sep 1996
  2. 2BRG Petroleum, Inc.Oct 1996 → Jun 1998
  3. 3Seagull Energy E&P Inc.Jul 1998 → Oct 2000
  4. 4Ocean Energy, Inc.Nov 2000 → Oct 2002
  5. 5Nadel & GussmanNov 2002 → Feb 2003
  6. 6Nadel and Gussman, L.L.C.Mar 2003 → Oct 2004

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
278922-98DrillTXO Production Corp.Sep 3, 1986Jun 26, 1985—10,498
278922-99DrillTXO Production Corp.Jun 25, 1985Jun 26, 1985—11,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-5-122153————
—— O-5-2953————
—— O-5-2953————

Formation tops

As filed on W-2/G-1. Subsea from 421 ft elevation.Download CSV →

FormationMD ftSubsea
Bac4,602-4,181
Woodbine4,894-4,473
Paluxy7,267-6,846
Rodessa9,410-8,989
Travis PeakUPPER TRAVIS PEAK10,094-9,673
Travis PeakLOWER TRAVIS PEAK10,278-9,857

Perforations

Perforated and open-hole intervals.

FromToType
9,4889,496Perforated
10,13510,138Perforated
10,13510,333Perforated
10,19110,194Perforated
10,31610,319Perforated
10,32410,333Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,60511500 S
4.510,4987.875550 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 18, 1992Aug 20, 1991—
00Oct 9, 1986Jun 5, 1986Yes
00Oct 8, 1986Jun 5, 1986Yes
00Oct 6, 1986Sep 9, 1986Yes
00Oct 2, 1986——
00Sep 12, 1986——
00Jan 20, 1986Nov 20, 1985Yes
00Jan 14, 1986——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21330511, documented in the API reference.