WELL · 42-213-30596 · DISTRICT 5

Roberts/Miller-Holloway G.U. #1

Plugged

Henderson County · Sand Trap (James Lime) field  · Directional

Roberts/Miller-Holloway G.U. #1 (API 42-213-30596) is a plugged well in Henderson County, plugged March 24, 2025, last operated by Highmark Energy Operating LLC.

The RRC has issued one drilling permit (amended twice), issued March 24, 1987, permitted to 11,560 ft.

It was permitted by Txp Operating Company and has since transferred to Highmark Energy Operating LLC on the wellbore schedule.

Completion filings report 5 formation tops, including Georgetown, Paluxy, Glen Rose, Massive Anhydrite (marker).

Operator of record

Highmark Energy Operating LLC

Permitted by TXP Operating Company; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Dec 4, 2025 · 23 permits on file · (903) 876-2591

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHighmark Energy Operating LLC
Production reportsHighmark Energy Operating, LLCthrough Mar 2023
Latest permitTXP Operating CompanyMar 24, 1987

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,560
total depth, ft
3
permits on file
Mar 24, 1987
last permit issued
Jun 27, 1987
completed
0
cumulative oil, bbl
25.3M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 27, 1987
Shut in
—
Plugged
Mar 24, 2025

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Roberts/Miller-Holloway G.U. G-5-124987Sand Trap (James Lime)Highmark Energy Operating, LLC1025.3MJan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Pennzoil Exploration & Prod. Co.Jan 1993 → Feb 1999
  2. 2Pennzenergy Exp. & Prod., L.L.C.Mar 1999 → Mar 2000
  3. 3Devon Energy Production Co, L.P.Apr 2000 → Mar 2007
  4. 4Hunt Oil CompanyApr 2007 → Aug 2014
  5. 5Vanguard Operating, LLCSep 2014 → Aug 2019
  6. 6Grizzly OP of Delaware, LLCSep 2019 → Mar 2021
  7. 7Highmark Energy Operating, LLCApr 2021 → Mar 2023

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
328113-97DrillTXP Operating CompanyAug 17, 1987Mar 24, 1987—11,560
328113-98DrillTXP Operating CompanyApr 27, 1987Mar 24, 1987May 2, 198711,560
328113-99DrillTXP Operating CompanyMar 23, 1987Mar 24, 1987—11,300

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-5-124987————

Formation tops

As filed on W-2/G-1. Subsea from 461 ft elevation.Download CSV →

FormationMD ftSubsea
Georgetown5,974-5,513
Paluxy7,303-6,842
Glen Rose7,715-7,254
Massive Anhydrite (marker)BASE MASSIVE ANHYDRITE9,960-9,499
James Lime10,462-10,001

Perforations

Perforated and open-hole intervals.

FromToType
10,46410,473Perforated
10,47610,500Perforated
10,51010,574Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
2055——
13.37550517.5470 S
9.6255,73012.251,975 S
5.510,7858.5790 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 6, 1987Jul 28, 1987Yes
00Sep 30, 1987——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21330596, documented in the API reference.