WELL · 42-213-30776 · DISTRICT 5

Ogu (Howell, W.Y. -6) #195

N

Henderson County  · Vertical

Ogu (Howell, W.Y. -6) #195 (API 42-213-30776) is a permitted well in Henderson County filed by Xto Energy Inc.; no completion report is on file yet.

The RRC has issued 4 drilling permits between 1997 and 2005, permitted to 11,600 ft.

Completion filings report 6 formation tops, including Rodessa, James Lime, Peittit, Pettit.

Operator of record

XTO Energy Inc.

Spring, TX · P-5 Y, filed Feb 4, 2026 · 16,156 permits on file · (832) 625-1100

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsUrban Oil & Gas Group, LLCthrough Apr 2026
Latest permitXTO Energy Inc.May 12, 2005
11,600
total depth, ft
4
permits on file
May 12, 2005
last permit issued
—
completed
0
cumulative oil, bbl
739K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 1997 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Ogu (Howell, W. Y. -6) G-5-179580Opelika (Travis Peak)Urban Oil & Gas Group, LLC10132KSep 2000 – Jul 2026
Ogu (Howell, W.Y. -6) G-5-209826Opelika (Cotton Valley)Urban Oil & Gas Group, LLC10246KOct 2004 – Jul 2026
Ogu (Howell, W. Y. -6) G-5-163766Opelika (Cotton Valley)Cross Timbers Operating Company10361KJun 1997 – Sep 2000

Gas, mcf lease total

Last 12 months 3,909 · prior 12 2,528(+55%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Enserch Exploration, IncJun 1997 → Mar 1998
  2. 2Eex CorporationApr 1998 → Apr 1998
  3. 3Cross Timbers Operating CompanyMay 1998 → May 2001
  4. 4XTO Energy Inc.Jun 2001 → Jan 2025
  5. 5Urban Oil & Gas Group, LLCFeb 2025 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
600566-99RecompletionXTO Energy Inc.May 11, 2005May 12, 2005—11,450
520146-99RecompletionXTO Energy Inc.May 20, 2002May 22, 2002—11,450
500967-99RecompletionCross Timbers Operating CompanyOct 18, 2000Oct 19, 2000Sep 7, 200011,450
461225-99DrillEnserch Exploration, IncApr 16, 1997Apr 16, 1997Apr 26, 199711,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-5-163766————
—— G-5-179580————
—— G-5-209826————

Formation tops

As filed on W-2/G-1. Subsea from 384 ft elevation.Download CSV →

FormationMD ftSubsea
Rodessa8,010-7,626
James LimeJAMES8,491-8,107
James Lime8,491-8,107
Peittit8,610-8,226
Pettit8,610-8,226
Travis Peak8,750-8,366
Cotton Valley10,367-9,983

Perforations

Perforated and open-hole intervals.

FromToType
8,95710,014Perforated
10,48410,889Perforated
10,48411,346Perforated
10,96611,166Perforated
11,33611,346Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,23512.25410 S
9.6251,23612.25410 S
4.511,4507.8751,335 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 3, 2006Dec 12, 2005—
00Sep 29, 2005Apr 19, 2005—
00Aug 5, 2005——
00Oct 23, 2002Sep 23, 2002—
00Jan 2, 2001Oct 23, 2000Yes
00Nov 27, 2000——
00Mar 20, 2000Feb 4, 2000—
00Jan 24, 2000Dec 27, 1999—
00Aug 14, 1997Jul 7, 1997Yes
00Aug 8, 1997——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21330776, documented in the API reference.