WELL · 42-213-30914 · DISTRICT 5
Easter Seals R-1 #1
Henderson County · Wildcat field · Vertical
Easter Seals R-1 #1 (API 42-213-30914) is a plugged well in Henderson County, plugged December 18, 2024, last operated by Perryman Exp. And Prod. LLC.
The RRC has issued one drilling permit, issued March 29, 2007, permitted to 9,000 ft.
It was permitted by West Mountain Operating CO, Inc. and has since transferred to Perryman Exp. And Prod. LLC on the wellbore schedule.
Completion filings report 5 formation tops, including Woodbine, Top Ma, Rodessa, Pettit.
Operator of record
Permitted by West Mountain Operating Co, Inc.; the EWA schedule now lists a different operator.
Athens, TX · P-5 Y, filed Dec 4, 2025 · 2 permits on file · (903) 603-8117
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Perryman Exp. and Prod. LLC |
| Production reports | none |
| Latest permit | West Mountain Operating Co, Inc.Mar 29, 2007 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,000
- total depth, ft
- 1
- permits on file
- Mar 29, 2007
- last permit issued
- Mar 28, 2008
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · May 2008 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 28, 2008
- Shut in
- —
- Plugged
- Dec 18, 2024
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Easter Seals R-1 O-5-3915 | Wildcat | Perryman Exp. and Prod., LLC | 1 | 0 | 0 | May 2008 – Jul 2026 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 635638-99 | Drill | West Mountain Operating Co, Inc. | Mar 21, 2007 | Mar 29, 2007 | Mar 29, 2007 | 9,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-5-3915 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 341 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| WoodbineTOP WOODBINE | 4,080 | -3,739 |
| WoodbineBASE WOODBINE | 4,760 | -4,419 |
| Top MA | 7,510 | -7,169 |
| RodessaTOP RODESSA | 7,670 | -7,329 |
| PettitTOP PETTIT | 8,270 | -7,929 |
| Travis PeakTOP TRAVIS PEAK | 8,490 | -8,149 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,328 | 5,348 | Perforated |
| 5,728 | 5,748 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 16 | 60 | — | — |
| 8.625 | 711 | 11 | 266 S |
| 4.5 | 9,000 | 7.875 | 1,027 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 23, 2010 | May 10, 2010 | Yes |
| 00 | May 24, 2010 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-213-30914 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-213-30914 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/21330914, documented in the API reference.