WELL · 42-213-30975 · DISTRICT 5

Catfish Creek A #3

N

Henderson County · Kris Perryman (Rodessa) field  · Vertical

Catfish Creek A #3 (API 42-213-30975) is a well in Henderson County operated by O Benco Inc., completed June 20, 2013.

The RRC has issued one drilling permit, issued October 2, 2008, permitted to 11,000 ft.

It was permitted by West Mountain Operating CO, Inc. and has since transferred to O Benco Inc. on the wellbore schedule.

Completion filings report 6 formation tops, including Budda, Paluxy, BMA, Rodessa.

Its 2 leases have reported 7.21K barrels of oil and 23.7K mcf of gas since April 2009, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

O Benco Inc.

Permitted by West Mountain Operating Co, Inc.; the EWA schedule now lists a different operator.

Shreveport, LA · P-5 Y, filed Mar 11, 2022 · 374 permits on file · (318) 865-8568

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleO Benco Inc.
Production reports84 Energy LLCthrough Mar 2025
Latest permitWest Mountain Operating Co, Inc.Oct 2, 2008

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,000
total depth, ft
1
permits on file
Oct 2, 2008
last permit issued
Jun 20, 2013
completed
7.21K
cumulative oil, bbl
23.7K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 2009 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 20, 2013
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Catfish Creek A O-5-4279Carroll Springs (Rodessa)84 Energy LLC19290Sep 2015 – Jul 2026
Catfish Creek A O-5-3904Kris Perryman (Rodessa)O'Benco, Inc.16.28K23.7KApr 2009 – Feb 2017

Oil, barrels lease total

Last 12 months 0 · prior 12 238(-100%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1West Mountain Operating Co, Inc.Aug 2009 → Apr 2010
  2. 2Perryman Exp. and Prod., LLCMay 2010 → May 2011
  3. 3Buccaneer Operating LLCJul 2012 → May 2014
  4. 4O'Benco, Inc.Jul 2014 → Dec 2017
  5. 584 Energy LLCMar 2025 → Mar 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
671300-99DrillWest Mountain Operating Co, Inc.Sep 16, 2008Oct 2, 2008Oct 8, 200811,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-5-3904————
—— O-5-4279————

Formation tops

As filed on W-2/G-1. Subsea from 386 ft elevation.Download CSV →

FormationMD ftSubsea
Budda6,334-5,948
Paluxy7,515-7,129
Paluxy7,518-7,132
BMA9,758-9,372
Rodessa9,758-9,372
James Lime10,200-9,814
Pettit10,588-10,202

Perforations

Perforated and open-hole intervals.

FromToType
9,7849,790Perforated
10,58810,592Perforated
10,60010,609Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,98012.25667 S
5.510,8108.75837 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 19, 2016Sep 5, 2013—
00Sep 25, 2013Sep 5, 2013—
00Apr 29, 2013Apr 12, 2013—
00Apr 16, 2010Sep 8, 2009Yes
00Oct 15, 2009——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.