WELL · 42-213-31039 · DISTRICT 5

Janet Wilson et AL #1

N

Henderson County · Wildcat field  · Directional

Janet Wilson ET AL #1 (API 42-213-31039) is a well in Henderson County operated by Maximus Operating Ltd., completed June 1, 2013.

The RRC has issued 2 drilling permits between 2013 and 2019, permitted to 9,000 ft.

Completion filings report 9 formation tops, including Austin Chalk, B. Austin Chalk, T Woodbine, Woodbine.

Its 2 leases have reported 121K barrels of oil since June 2013, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 29K barrels injected in the 12 months reported through November 2025; TexNet located 0 M2+ earthquakes within 10 km over the last two years.

Operator of record

Maximus Operating Ltd.

Kilgore, TX · P-5 Y, filed Aug 4, 2025 · 107 permits on file · (903) 753-0941

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMaximus Operating Ltd.
Production reportsMaximus Operating, Ltd.through Apr 2026
Latest permitMaximus Operating, Ltd.Nov 4, 2019
9,000
total depth, ft
2
permits on file
Nov 4, 2019
last permit issued
Jun 1, 2013
completed
121K
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 2013 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 1, 2013
Shut in
—
Plugged
—

Surface location

32.352471, -95.457176

OpenStreetMap → ·  Google Maps →

Permit surface location from the RRC GIS record, in Henderson County.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Wilson, Janet et AL O-5-4042Tom Burchard (Paluxy)Maximus Operating, Ltd.2121K0Jan 2014 – Jul 2026
Janet Wilson et AL O-5-4083WildcatMaximus Operating, Ltd.100Jun 2013 – Aug 2021

Oil, barrels lease total

Last 12 months 14,004 · prior 12 17,949(-22%)

01K2K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Maximus Operating, Ltd.Jan 2014 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
858551-99ReclassMaximus Operating, Ltd.Oct 29, 2019Nov 4, 2019Apr 25, 20138,258
760622-99DrillMaximus Operating, Ltd.Apr 12, 2013Apr 17, 2013Apr 25, 20139,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-5-4042————
—— O-5-4083————

Formation tops

As filed on W-2/G-1. Subsea from 375 ft elevation.Download CSV →

FormationMD ftSubsea
Austin Chalk4,850-4,475
B. Austin Chalk4,850-4,475
T Woodbine5,300-4,925
Woodbine5,300-4,925
T Buda6,240-5,865
T Goodland Lime7,684-7,309
Paluxy7,800-7,425
T Paluxy7,800-7,425
T Glenrose8,135-7,760

Perforations

Perforated and open-hole intervals.

FromToType
7,8297,888Perforated
8,0108,070Perforated
8,0438,052Open hole
8,0548,061Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,80812.25583 S
5.58,4408.75780 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 4, 2024Jun 8, 2023—
00Aug 6, 2021Jul 8, 2021—
00Dec 3, 2014Jul 16, 2013Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Nearby wells and their tops

NEAREST 8 LOCATED WELLS WITH TOPS · WITHIN 16 KM

Draw a cross-section

This well's tops beside its 5 nearest neighbours, subsea-aligned so they line up regardless of surface terrain.

Open the cross-section →

Bradie O Hopper42-423-32435

4.9 KM · Maximus Operating, Ltd. · Section with this well →

Base of Salt8,440-7,999
Goodland8,518-8,077
Paluxy8,676-8,235
Glen Rose9,085-8,644
Woodbine—
Cotton Valley—
Nacatoch—
Pettit—

10 TOPS · FIRST 8

Newton, William F.42-423-31345

6.0 KM · Maximus Operating, Ltd. · Section with this well →

Salt920-482
Rodessa10,555-10,117
Travis Peak10,800-10,362

West Tyler (Paluxy Bankhead)42-423-32452

6.3 KM · Weathers Exploration, Inc. · Section with this well →

Nacatoch2,814-2,350
Woodbine5,405-4,941
Paluxy7,665-7,201
Travis Peak—
Cotton Valley—
Rodessa—
Pettit—

West Tyler (Paluxy Bankhead)42-423-32467

6.4 KM · Weathers Exploration, Inc. · Section with this well →

Nacatoch2,846-2,392
Woodbine5,409-4,955
Paluxy7,866-7,412
Travis Peak—
Rodessa—
Pettit—
Cotton Valley—

Covington42-423-32399

9.1 KM · Chesapeake Operating, L.L.C. · Section with this well →

Nacatoch3,754-3,307
Woodbine6,115-5,668
Goodland8,780-8,333
Paluxy8,932-8,485
Travis Peak—
Rodessa—
Cotton Valley—
Pettit—

Antony42-423-32465

9.5 KM · Valence Operating Company · Section with this well →

Nacatoch3,139-2,667
Woodbine5,935-5,463
Goodland8,706-8,234
Paluxy8,706-8,234
Cotton Valley—
Travis Peak—
Pettit—
Rodessa—

Cleo42-423-32466

9.5 KM · Valence Operating Company · Section with this well →

Nacatoch3,153-2,681
Woodbine5,949-5,477
Paluxy8,702-8,230
Goodland8,702-8,230
Cotton Valley—
Travis Peak—
Rodessa—
Pettit—

McCrary42-423-32480

12.3 KM · Valence Operating Company · Section with this well →

Nacatoch3,404-2,895
Woodbine6,292-5,783
Goodland9,049-8,540
Paluxy—
Rodessa—
Travis Peak—
Pettit—
Cotton Valley—

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

29K
bbl, last 12 reported months
126K
bbl, all reported
Nov 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000119374H-1 InjectionActive5003,0007,829–7,888

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 28,985 · prior 12 32,525(-11%)

01K2K3K20242025

TexNet catalog via USGS

Seismicity near this well

0
M2+ events within 10 km, last 2 years
—
largest

A proximity count, not an attribution. How to read it →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21331039, documented in the API reference.