WELL · 42-215-00695 · DISTRICT 4

Roper Charles C. #2

N

Hidalgo County · Monte Christo N. (F-12) field  · Vertical

Roper Charles C. #2 (API 42-215-00695) is a permitted well in Hidalgo County filed by Texaco E & P Inc.; no completion report is on file yet.

The RRC has issued 2 drilling permits between 1989 and 1992, permitted to 9,800 ft.

It was permitted by Texaco E & P Inc. and has since transferred to Texaco Tpc Inc. on the wellbore schedule.

Completion filings report one formation top, including Frio.

Operator of record

Texaco TPC Inc.

Permitted by Texaco E & P Inc.; the EWA schedule now lists a different operator.

New Orleans, LA · P-5 Y, filed Aug 3, 1992 · 40 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTexaco TPC Inc.
Production reportsMerit Energy Companythrough Apr 2026
Latest permitTexaco E & P Inc.Nov 9, 1992

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,800
total depth, ft
2
permits on file
Nov 9, 1992
last permit issued
—
completed
0
cumulative oil, bbl
416K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Clemons Gas Unit No. 1 G-4-132467Monte Christo (58,59 Cons.)Merit Energy Company100Jan 1993 – Jul 2026
Clemons Gas Unit No. 1 G-4-143651Monte Christo (56-a, N)Merit Energy Company10416KJan 1993 – Jul 2026

Gas, mcf lease total

Last 12 months 3,521 · prior 12 4,492(-22%)

01K2K3K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texaco E & P Inc.Jan 1993 → Mar 2000
  2. 2Coastal Oil & Gas CorporationApr 2000 → Jun 2001
  3. 3EL Paso Production Oil & Gas Co.Jul 2001 → Mar 2006
  4. 4EL Paso E & P Company, L. P.Aug 2007 → Jul 2012
  5. 5EP Energy E&P Company, L.P.Aug 2012 → Oct 2013
  6. 6Cantera Operating, LLCNov 2013 → Nov 2017
  7. 7Merit Energy CompanyDec 2017 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
404433-99RecompletionTexaco E & P Inc.Oct 8, 1992Nov 9, 1992Nov 10, 19929,404
361945-99RecompletionTana Oil & Gas Corp.Jul 25, 1989Jul 25, 1989—9,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-132467————
—— G-4-143651————

Formation tops

As filed on W-2/G-1. Subsea from 191 ft elevation.Download CSV →

FormationMD ftSubsea
FrioFRIO (58)9,148-8,957

Perforations

Perforated and open-hole intervals.

FromToType
8,3609,010Perforated
8,3638,529Perforated
8,7728,822Perforated
8,9609,010Perforated
9,1489,277Perforated
9,1489,284Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.752,000——
10.752,01714.75970 S
10.752,017—970 S
5.58,296——
5.58,3149.875340 S
5.58,314—340 S
2.8759,3674.75350 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 15, 2007Jun 5, 2006—
00Feb 22, 1993Jan 19, 1993Yes
00Jan 29, 1993——
00Jan 4, 1990Nov 15, 1989Yes
00Dec 1, 1989——
00Jan 12, 1984Jul 20, 1964—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21500695, documented in the API reference.