WELL · 42-215-00703 · DISTRICT 4

Chandler-Taylor Unit #1

Plugged

Hidalgo County · Monte Christo North (F-17) field  · Vertical

Chandler-Taylor Unit #1 (API 42-215-00703) is a plugged well in Hidalgo County, plugged March 6, 1981, last operated by Tenneco Oil CO..

The RRC has issued one drilling permit (amended once), issued July 24, 1998, permitted to 9,750 ft.

It was permitted by Hilcorp Energy Company and has since transferred to Tenneco Oil CO. on the wellbore schedule.

Operator of record

Tenneco Oil Co.

Permitted by Hilcorp Energy Company; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Feb 5, 2016 · 863 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTenneco Oil Co.
Production reportsnone
Latest permitHilcorp Energy CompanyJul 24, 1998

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,750
total depth, ft
2
permits on file
Jul 24, 1998
last permit issued
—
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Sep 1999 THROUGH Sep 2012

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Mar 6, 1981

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Chandler-Taylor Unit G-4-174437Monte Christo, N. (F-12)EP Energy E&P Company, L.P.100Sep 1999 – Sep 2012

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
478131-98ReenterHilcorp Energy CompanyMay 12, 1999Jul 24, 1998Aug 25, 19999,750
478131-99ReenterHouston Resources Corp.Jul 20, 1998Jul 24, 1998—8,350

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-174437————

Perforations

Perforated and open-hole intervals.

FromToType
8,2408,260Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.752,01515—
10.752,015——
79,0499.875—

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 3, 1999Oct 8, 1999—
00Oct 13, 1999——
00Jan 12, 1984Dec 11, 1959—
00Jan 12, 1984Nov 15, 1957—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21500703, documented in the API reference.