WELL · 42-215-00770 · DISTRICT 4
West Temple W. Etal #8
Hidalgo County · Tabasco (Heard FB 2) field · Vertical
West Temple W. Etal #8 (API 42-215-00770) is a well in Hidalgo County operated by Smith Production Inc., completed February 7, 1953.
The RRC has issued 3 drilling permits between 1993 and 2000, permitted to 7,250 ft.
No lease production has been reported under this well’s leases.
Operator of record
The Woodlands, TX · P-5 Y, filed Sep 4, 2025 · 433 permits on file · (800) 533-3182
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Smith Production Inc. |
| Production reports | Fidelity Explor. & Prod. Co.through Jul 2005 |
| Latest permit | Smith Production Inc.Oct 13, 2000 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,250
- total depth, ft
- 3
- permits on file
- Oct 13, 2000
- last permit issued
- Feb 7, 1953
- completed
- 0
- cumulative oil, bbl
- 1.11M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Feb 7, 1953
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 9 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| West, Temple W. G-4-179287 | Tabasco (M) | Hilcorp Energy Company | 1 | 0 | 255K | Sep 2000 – Jul 2026 |
| West, Temple W. G-4-165303 | Tabasco (F-Sand FB-1) | Smith Production Inc. | 1 | 0 | 326K | Sep 1997 – Sep 2000 |
| West, Temple W., Etal O-4-3123 | Tabasco (Heard FB 2) | Smith Production Inc. | 6 | 0 | 0 | Jan 1993 – Nov 1999 |
| West, Temple W. G-4-146201 | Tabasco (G) | Vastar Resources, Inc. | 1 | 0 | 526K | Jun 1993 – Sep 1997 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Arco Oil & Gas Co.Jun 1993 → Feb 1994
- 2Vastar Resources, Inc.Mar 1994 → Jan 1999
- 3Smith Production Inc.Feb 1999 → Apr 2005
- 4Fidelity Explor. & Prod. Co.May 2005 → Jul 2005
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 500587-99 | Recompletion | Smith Production Inc. | Oct 9, 2000 | Oct 13, 2000 | Sep 8, 2000 | 7,250 |
| 466797-99 | Recompletion | Vastar Resources, Inc. | Aug 27, 1997 | Aug 27, 1997 | Aug 28, 1997 | 7,250 |
| 410331-99 | Recompletion | Arco Oil & Gas Co. | Mar 30, 1993 | Apr 5, 1993 | May 6, 1993 | 7,250 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-146201 | — | — | — | — |
| — | — G-4-165303 | — | — | — | — |
| — | — G-4-179287 | — | — | — | — |
| — | — O-4-3123 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,022 | 5,040 | Perforated |
| 5,220 | 5,240 | Perforated |
| 6,150 | 6,300 | Perforated |
| 6,175 | 6,186 | Perforated |
| 6,196 | 6,220 | Perforated |
| 6,724 | 6,731 | Perforated |
| 6,738 | 6,746 | Perforated |
| 6,760 | 6,770 | Perforated |
| 6,791 | 6,798 | Perforated |
| 6,808 | 6,812 | Perforated |
| 6,848 | 6,852 | Perforated |
| 6,872 | 6,877 | Perforated |
| 6,895 | 6,899 | Perforated |
| 6,902 | 6,902 | Perforated |
| — | 6,155 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,093 | — | 350 S |
| 9.875 | 1,108 | 13.375 | 550 S |
| 9.625 | 1,108 | — | 550 S |
| 9.625 | 1,122 | 13.375 | 350 S |
| 2.375 | 6,180 | — | — |
| 5.5 | 6,956 | — | 298 S |
| 5.5 | 6,969 | 8.75 | 298 S |
| 5.5 | 6,969 | — | 298 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 31, 2017 | Jul 10, 2017 | — |
| 00 | Jun 23, 2010 | Jul 21, 2009 | — |
| 00 | Jan 7, 2010 | Nov 2, 2009 | — |
| 00 | Dec 16, 2000 | Oct 20, 2000 | Yes |
| 00 | Nov 7, 2000 | — | — |
| 00 | Dec 29, 1997 | Sep 25, 1997 | Yes |
| 00 | Dec 3, 1997 | — | — |
| 00 | Nov 12, 1993 | Jun 16, 1993 | Yes |
| 00 | Aug 30, 1993 | — | — |
| 00 | Mar 19, 1991 | Feb 1, 1991 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-215-00770 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-215-00770 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 0
- bbl, all reported
- Jan 2016
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000069135 | H-1 Injection | Plugged Feb 4, 2016 | 6,000 | 3,075 | 6,150–6,400 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/21500770, documented in the API reference.