WELL · 42-215-01384 · DISTRICT 4
Ramos J. #1 D
Hidalgo County · Los Torritos North (8200) field · Vertical
Ramos J. #1 D (API 42-215-01384) is a plugged well in Hidalgo County, plugged December 18, 1980, last operated by Tenneco Oil CO..
The RRC has issued one drilling permit, issued April 27, 1981, permitted to 8,300 ft.
It was permitted by American Petrofina CO. Of Tex. and has since transferred to Tenneco Oil CO. on the wellbore schedule.
Operator of record
Permitted by American Petrofina Co. of Tex.; the EWA schedule now lists a different operator.
Houston, TX · P-5 Y, filed Feb 5, 2016 · 863 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Tenneco Oil Co. |
| Production reports | none |
| Latest permit | American Petrofina Co. of Tex.Apr 27, 1981 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 8,300
- total depth, ft
- 1
- permits on file
- Apr 27, 1981
- last permit issued
- Jun 1, 1956
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Nov 1998
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 1, 1956
- Shut in
- —
- Plugged
- Dec 18, 1980
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Ramos, Jesus G-4-95496 | Los Torritos, North (McKinley) | 3-M Energy Corporation | 1 | 0 | 0 | Jan 1993 – Nov 1998 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 116171-99 | Other | American Petrofina Co. of Tex. | Apr 27, 1981 | Apr 27, 1981 | Apr 24, 1981 | 8,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-95496 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,767 | 6,777 | Perforated |
| 7,340 | 8,255 | Perforated |
| 8,212 | 8,224 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 1,215 | 15 | 600 S |
| 10.75 | 1,215 | 13.75 | — |
| 2.375 | 6,702 | — | — |
| 7 | 8,298 | — | — |
| 7 | 8,299 | 9.875 | 450 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Sep 8, 1981 | — |
| 00 | Jan 12, 1984 | Mar 8, 1973 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-215-01384 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-215-01384 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 1.88M
- bbl, all reported
- Jan 1999
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000042310 | W-14 Disposal | Plugged Nov 23, 1998 | 3,500 | 1,750 | 6,758–7,850 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 350(-100%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/21501384, documented in the API reference.