WELL · 42-215-01392 · DISTRICT 4
Pharr Fieldwide Unit #3
Hidalgo County · Pharr (Marks) field · Vertical
Pharr Fieldwide Unit #3 (API 42-215-01392) is a plugged well in Hidalgo County, plugged February 15, 1984, last operated by Tenneco Oil CO..
The RRC has issued 3 drilling permits between 1979 and 1996, permitted to 10,150 ft.
It was permitted by Fina Oil & Chemical Company and has since transferred to Tenneco Oil CO. on the wellbore schedule.
Completion filings report one formation top, including Pharr (Hanson).
Operator of record
Permitted by Fina Oil & Chemical Company; the EWA schedule now lists a different operator.
Houston, TX · P-5 Y, filed Feb 5, 2016 · 863 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Tenneco Oil Co. |
| Production reports | OXY USA Inc.through Jun 2012 |
| Latest permit | Fina Oil & Chemical CompanyNov 27, 1996 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 10,150
- total depth, ft
- 3
- permits on file
- Nov 27, 1996
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 2.54M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 1995 THROUGH Jul 2012
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Feb 15, 1984
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Pharr Fieldwide Unit G-4-160657 | Pharr(hanson) | OXY USA Inc. | 1 | 0 | 2.5M | Apr 1996 – Jul 2012 |
| Pharr Fieldwide Unit G-4-157517 | Pharr (Marks) | Fina Oil & Chemical Company | 1 | 0 | 40.2K | Oct 1995 – Apr 1996 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Fina Oil & Chemical CompanyOct 1995 → Dec 2000
- 2Totalfinaelf E&P USA IncJan 2001 → Aug 2003
- 3Total E&P USA, Inc.Sep 2003 → Jan 2006
- 4Shell Western E&PFeb 2006 → Apr 2011
- 5OXY USA Inc.May 2011 → Jun 2012
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 455605-99 | Recompletion | Fina Oil & Chemical Company | Nov 25, 1996 | Nov 27, 1996 | Apr 3, 1996 | 10,150 |
| 439040-99 | Reenter | Fina Oil & Chemical Company | Aug 17, 1995 | Aug 21, 1995 | Jun 15, 1995 | 10,150 |
| 59628-99 | Recompletion | Tenneco Oil Co. | Oct 3, 1979 | Oct 3, 1979 | — | 10,084 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-157517 | — | — | — | — |
| — | — G-4-160657 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 99 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Pharr (Hanson) | 9,525 | -9,426 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,531 | 6,537 | Perforated |
| 9,272 | 9,502 | Perforated |
| 9,820 | 9,980 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 1,265 | — | — |
| 10.75 | 1,281 | 13.625 | 700 S |
| 10.75 | 1,281 | 15 | 700 S |
| 5.5 | 1,897 | — | — |
| 2.875 | 6,396 | — | — |
| 7.625 | 8,372 | — | — |
| 7.625 | 8,373 | 9.75 | 490 S |
| 7.625 | 8,373 | 9.875 | 490 S |
| 2.5 | 9,888 | — | — |
| 5.5 | 10,079 | 6.625 | 183 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 10, 1997 | Nov 25, 1996 | Yes |
| 00 | Dec 3, 1996 | — | — |
| 00 | Jun 11, 1996 | Jan 22, 1996 | Yes |
| 00 | Jun 10, 1996 | Apr 25, 1996 | — |
| 00 | Apr 5, 1996 | — | — |
| 00 | Jan 12, 1984 | Jul 25, 1980 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-215-01392 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-215-01392 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/21501392, documented in the API reference.