WELL · 42-215-01421 · DISTRICT 4
McAllen Fieldwide Unit #25
Hidalgo County · Vertical
Mcallen Fieldwide Unit #25 (API 42-215-01421) is a disposal or injection well in Hidalgo County operated by Fina Oil & Chemical Company under an active UIC permit.
The RRC has issued 2 drilling permits (amended once) between 1992 and 1998, permitted to 9,855 ft.
It holds an active disposal or injection permit.
Operator of record
Dallas, TX · P-5 Y, filed Apr 13, 2001 · 1,328 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Fina Oil & Chemical Companythrough Apr 1993 |
| Latest permit | Fina Oil & Chemical CompanyJan 5, 1998 |
- 9,855
- total depth, ft
- 3
- permits on file
- Jan 5, 1998
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 707
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| McAllen Fieldwide Unit G-4-144743 | McAllen-Pharr (Consolidated) | Merit Energy Company | 1 | 0 | 707 | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Fina Oil & Chemical CompanyFeb 1993 → Apr 1993
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 471796-99 | Recompletion | Fina Oil & Chemical Company | Jan 2, 1998 | Jan 5, 1998 | — | 7,550 |
| 398005-98 | Reenter | Fina Oil & Chemical Company | Mar 12, 1993 | Apr 8, 1992 | Feb 26, 1992 | 9,855 |
| 398005-99 | Reenter | Fina Oil & Chemical Company | Apr 1, 1992 | Apr 8, 1992 | — | 9,400 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-144743 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,290 | 6,304 | Perforated |
| 6,357 | 6,365 | Perforated |
| 6,398 | 6,406 | Perforated |
| 6,628 | 6,660 | Perforated |
| 8,548 | 8,582 | Perforated |
| 9,419 | 9,651 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 1,272 | 15 | 600 S |
| 7.625 | 8,494 | 9.875 | 430 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 22, 1998 | Oct 9, 1998 | — |
| 00 | Apr 29, 1993 | Mar 11, 1993 | — |
| 00 | Apr 13, 1993 | — | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-215-01421 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-215-01421 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 1.13M
- bbl, all reported
- Jan 2026
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000088236 | H-1 Injection | Active | 2,500 | 1,500 | 6,290–7,650 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/21501421, documented in the API reference.