WELL · 42-215-01881 · DISTRICT 4
McAllen Fieldwide Unit #39
Hidalgo County · McAllen (Marks FB B) field · Vertical
Mcallen Fieldwide Unit #39 (API 42-215-01881) is a well in Hidalgo County operated by Fina Oil & Chemical Company, completed March 18, 1993.
The RRC has issued one drilling permit, issued December 17, 1992, permitted to 10,800 ft.
No lease production has been reported under this well’s leases.
Operator of record
Dallas, TX · P-5 Y, filed Apr 13, 2001 · 1,328 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Fina Oil & Chemical Company |
| Production reports | Merit Energy Companythrough Apr 2026 |
| Latest permit | Fina Oil & Chemical CompanyDec 17, 1992 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 10,800
- total depth, ft
- 1
- permits on file
- Dec 17, 1992
- last permit issued
- Mar 18, 1993
- completed
- 0
- cumulative oil, bbl
- 7.35M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 18, 1993
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| McAllen Fieldwide Unit G-4-152262 | McAllen-Pharr (Consolidated) | Merit Energy Company | 1 | 0 | 6.92M | Oct 1994 – Jul 2026 |
| McAllen Fieldwide Unit G-4-37174 | McAllen (Marks FB B) | Fina Oil & Chemical Company | 1 | 0 | 433K | Jan 1993 – Sep 1994 |
Gas, mcf lease total
Last 12 months 6,389 · prior 12 6,183(+3%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Fina Oil & Chemical CompanyFeb 1993 → Dec 2000
- 2Totalfinaelf E&P USA IncJan 2001 → Aug 2003
- 3Total E&P USA, Inc.Sep 2003 → Jan 2006
- 4Shell Western E&PFeb 2006 → Apr 2011
- 5OXY USA Inc.May 2011 → Apr 2017
- 6Merit Energy CompanyMay 2017 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 407094-99 | Recompletion | Fina Oil & Chemical Company | Dec 10, 1992 | Dec 17, 1992 | Aug 30, 1994 | 10,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-37174 | — | — | — | — |
| — | — G-4-152262 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,617 | 9,901 | Perforated |
| 9,963 | 9,973 | Perforated |
| 10,661 | 10,728 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 1,513 | — | — |
| 9.625 | 8,520 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 8, 1995 | Oct 1, 1995 | — |
| 00 | Mar 3, 1995 | Dec 16, 1994 | Yes |
| 00 | Jan 11, 1995 | — | — |
| 00 | Jul 23, 1993 | Jun 17, 1993 | — |
| 00 | Jan 12, 1984 | Oct 1, 1965 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-215-01881 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-215-01881 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/21501881, documented in the API reference.