WELL · 42-215-30049 · DISTRICT 4
Chandler-Jackson #3
Hidalgo County · Vertical
Chandler-Jackson #3 (API 42-215-30049) is a permitted well in Hidalgo County filed by Synergy Production Company; no completion report is on file yet.
The RRC has issued 4 drilling permits between 1985 and 1995, permitted to 9,600 ft.
Operator of record
Houston, TX · P-5 Y, filed Jan 5, 1996 · 23 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Hilcorp Energy Companythrough Feb 2018 |
| Latest permit | Synergy Production CompanyFeb 6, 1995 |
- 9,600
- total depth, ft
- 4
- permits on file
- Feb 6, 1995
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 670K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Chandler-Jackson G-4-153518 | Monte Christo, North (F-14-B) | Hilcorp Energy Company | 1 | 0 | 670K | Mar 1995 – Jul 2026 |
| Jackson, Chandler G-4-47823 | Monte Christo, N. (F-12) | Synergy Production Company | 1 | 0 | 0 | Jan 1993 – Mar 1995 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Synergy Production CompanyMar 1995 → Jan 1996
- 2Synergy Oil & Gas, Inc. (A)Feb 1996 → Aug 2001
- 3Penn Virginia Oil & Gas Corp.Sep 2001 → Mar 2005
- 4Penn Virginia Oil & Gas, L.P.Apr 2005 → Jan 2010
- 5Hilcorp Energy CompanyFeb 2010 → Feb 2018
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 432527-99 | Recompletion | Synergy Production Company | Feb 3, 1995 | Feb 6, 1995 | Feb 9, 1995 | 9,600 |
| 368113-99 | Recompletion | Fina Oil & Chemical Company | Dec 29, 1989 | Jan 18, 1990 | — | 9,600 |
| 298959-99 | Recompletion | Tenneco Oil Co. | Feb 28, 1986 | Mar 3, 1986 | — | 8,300 |
| 266738-99 | Recompletion | Tenneco Oil Co. | Feb 6, 1985 | Feb 12, 1985 | — | 8,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-47823 | — | — | — | — |
| — | — G-4-153518 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,802 | 8,816 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 2,054 | 10.5 | 775 S |
| 8.625 | 2,054 | 12.25 | 775 S |
| 5.5 | 8,300 | 7.875 | 450 S |
| 2.875 | 8,960 | 4.75 | 120 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 8, 1995 | Mar 17, 1995 | Yes |
| 00 | Apr 5, 1995 | — | — |
| 00 | Jan 12, 1984 | Mar 3, 1970 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-215-30049 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-215-30049 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/21530049, documented in the API reference.