WELL · 42-215-30148 · DISTRICT 4
Ramsower G.R. #1
Hidalgo County · Santellana South (S-2) field · Vertical
Ramsower G.R. #1 (API 42-215-30148) is a plugged well in Hidalgo County, plugged March 1, 2007, last operated by Expando Production Company.
The RRC has issued 2 drilling permits between 1981 and 1988, permitted to 8,268 ft.
Operator of record
Wichita Falls, TX · P-5 Y, filed Jan 6, 1995 · 67 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Expando Production Company |
| Production reports | Spindletop Oil & Gas Companythrough Mar 2002 |
| Latest permit | Expando Production CompanyMar 15, 1988 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 8,268
- total depth, ft
- 2
- permits on file
- Mar 15, 1988
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 809K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Feb 2007
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Mar 1, 2007
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Ramsower, G.R. G-4-126909 | Santellana (Frio) | Spindletop Oil & Gas Company | 1 | 0 | 809K | Jan 1993 – Feb 2007 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1CTR Petroleum, Inc.Jan 1993 → Dec 2001
- 2Spindletop Oil & Gas CompanyMar 2002 → Mar 2002
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 343766-99 | Recompletion | Expando Production Company | Mar 11, 1988 | Mar 15, 1988 | — | 8,268 |
| 112543-99 | Recompletion | Expando Production Company | Mar 19, 1981 | Mar 19, 1981 | — | 8,268 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-126909 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,949 | 6,953 | Perforated |
| 7,410 | 7,430 | Perforated |
| 7,506 | 7,516 | Perforated |
| 7,578 | 7,584 | Perforated |
| 8,012 | 8,022 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.875 | 1,659 | 13.75 | 965 S |
| 4.5 | 6,800 | 8.75 | 800 S |
| 2.375 | 7,433 | — | — |
| 2.375 | 7,565 | — | — |
| 2.375 | 7,971 | — | — |
| 4.5 | 8,268 | 8.75 | 800 S |
| 4.5 | 8,269 | 8.75 | 800 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 29, 1988 | Mar 30, 1988 | Yes |
| 00 | Apr 29, 1988 | — | — |
| 00 | Jan 12, 1984 | Mar 25, 1981 | — |
| 00 | Jan 12, 1984 | Mar 12, 1979 | — |
| 00 | Jan 12, 1984 | Nov 24, 1976 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-215-30148 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-215-30148 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/21530148, documented in the API reference.