WELL · 42-215-30899 · DISTRICT 4

Sweeney J. J. #5

Plugged

Hidalgo County · Donna (7560) field  · Vertical

Sweeney J. J. #5 (API 42-215-30899) is a plugged well in Hidalgo County, plugged August 29, 2016, last operated by Amoco Production Company.

The RRC has issued 4 drilling permits between 1979 and 1997, permitted to 11,000 ft.

It was permitted by MW Petroleum Corporation and has since transferred to Amoco Production Company on the wellbore schedule.

Completion filings report one formation top, including Frio.

Operator of record

Amoco Production Company

Permitted by MW Petroleum Corporation; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed May 7, 2004 · 7,201 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAmoco Production Company
Production reportsMW Petroleum Corporationthrough Oct 1997
Latest permitMW Petroleum CorporationAug 4, 1997

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,000
total depth, ft
4
permits on file
Aug 4, 1997
last permit issued
Nov 19, 1979
completed
0
cumulative oil, bbl
157K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2016

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 19, 1979
Shut in
—
Plugged
Aug 29, 2016

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Sweeney, J. J. G-4-163757Donna (Armstrong)Mission River Systems, Inc.1010.8KJul 1997 – Aug 2016
Sweeny, J.J. G-4-129040Donna (Frio 5500)MW Petroleum Corporation10147KJan 1993 – Aug 1997

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1MW Petroleum CorporationJan 1993 → Oct 1997

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
465460-99RecompletionMW Petroleum CorporationJul 25, 1997Aug 4, 1997Jul 8, 19975,450
344510-99RecompletionAmoco Production CompanyMar 28, 1988Mar 29, 1988—9,662
139815-99RecompletionAmoco Production CompanyNov 6, 1981Nov 6, 1981—9,700
40303-99DrillAmoco Production CompanyJan 5, 1979Jan 5, 1979Mar 10, 197911,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-129040————
—— G-4-163757————

Formation tops

As filed on W-2/G-1. Subsea from 78 ft elevation.Download CSV →

FormationMD ftSubsea
FrioFRIO, DONNA (ARM)5,320-5,242
FrioFRIO, DONNA (HARRELL)5,400-5,322
FrioFRIO, ALAMO (5500)5,495-5,417
FrioFRIO, ALAMO (7500)7,520-7,442
FrioFRIO, ALAMO (7800)7,860-7,782
FrioFRIO, ALAMO (8050)8,020-7,942

Perforations

Perforated and open-hole intervals.

FromToType
5,3015,314Perforated
5,4945,510Perforated
6,7066,713Perforated
7,1987,205Perforated
7,5337,537Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,54414.75795 S
10.751,54514.75795 S
2.3756,640——
27,132——
2.57,495——
7.6258,3009.6251,700 S
7.6258,3009.8751,700 S
7.6258,300—1,700 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 14, 1997Jul 28, 1997Yes
00Aug 7, 1997——
00Jan 5, 1989Nov 14, 1988Yes
00Dec 7, 1988——
00Jan 12, 1984Apr 30, 1982—
00Jan 12, 1984Feb 7, 1980—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21530899, documented in the API reference.