WELL · 42-215-31092 · DISTRICT 4

Hudnall J. S. et AL #1

N

Hidalgo County · Arrowhead Ranch (Vicks 13 200) field  · Vertical

Hudnall J. S. ET AL #1 (API 42-215-31092) is a well in Hidalgo County operated by Cng Producing Company, completed August 26, 1981.

The RRC has issued 2 drilling permits between 1980 and 1990, permitted to 14,020 ft.

Completion filings report 2 formation tops, including Frio, Vicksburg.

No lease production has been reported under this well’s leases.

Operator of record

CNG Producing Company

New Orleans, LA · P-5 Y, filed Jan 11, 2001 · 84 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCNG Producing Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitCNG Producing CompanyDec 13, 1990

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

14,020
total depth, ft
2
permits on file
Dec 13, 1990
last permit issued
Aug 26, 1981
completed
0
cumulative oil, bbl
1.25M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 26, 1981
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hudnall, J. S. G-4-137741Arrowhead Ranch (VKS 12,300)Hilcorp Energy Company101.25MJan 1993 – Jul 2026
— G-4-95308——000—

Gas, mcf lease total

Last 12 months 285 · prior 12 1,241(-77%)

0200400600202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Graham Royalty, Ltd.Jan 1993 → Oct 1993
  2. 2Midpar L.P.Nov 1993 → Feb 1995
  3. 3Parker & Parsley Development L.PMar 1995 → Aug 1997
  4. 4Pioneer Natural Res. USA, Inc.Sep 1997 → Jun 1999
  5. 5Prize Operating CompanyJul 1999 → Mar 2002
  6. 6Gruy Petroleum Management Co.Apr 2002 → Mar 2004
  7. 7Denali Oil & Gas Management, LLCApr 2004 → Jan 2006
  8. 8Chesapeake Operating, Inc.Feb 2006 → Aug 2014
  9. 9Hilcorp Energy CompanySep 2014 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
381350-99RecompletionCNG Producing CompanyNov 20, 1990Dec 13, 1990Dec 18, 199014,020
100024-99DrillCNG Producing CompanyNov 20, 1980Nov 20, 1980Feb 3, 198114,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-95308————
—— G-4-137741————

Formation tops

As filed on W-2/G-1. Subsea from 332 ft elevation.Download CSV →

FormationMD ftSubsea
FrioLOWER FRIO, TOP5,370-5,038
VicksburgTOP VICKSBURG7,520-7,188
FrioLOWER FRIO, BASE8,138-7,806

Perforations

Perforated and open-hole intervals.

FromToType
12,31612,324Perforated
12,34012,350Perforated
12,37612,384Perforated
12,39612,406Perforated
13,19413,216Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
2040——
13.3752,52817.51,570 S
13.3752,55817.51,570 S
9.6259,79112.252,245 S
2.87513,079——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 2, 1991Feb 19, 1991Yes
00Apr 23, 1991——
00Jan 12, 1984Sep 16, 1981—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21531092, documented in the API reference.