WELL · 42-215-31184 · DISTRICT 4

Garcia J.A. #1

Plugged

Hidalgo County · Bloomberg West (5500) field  · Vertical

Garcia J.A. #1 (API 42-215-31184) is a plugged well in Hidalgo County, plugged August 2, 2010, last operated by Riddle Engineering Corp..

The RRC has issued 4 drilling permits between 1981 and 2006, permitted to 7,000 ft.

Its 4 leases have reported 23.1K barrels of oil and 96K mcf of gas since January 1993, last reporting in August 2010. The leases carry 4 wells, so these are lease totals, not this well alone.

Operator of record

Riddle Engineering Corp.

Corpus Christ, TX · P-5 Y, filed Oct 7, 2011 · 21 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRiddle Engineering Corp.
Production reportsRiddle Engineering Corp.through Sep 2008
Latest permitRiddle Engineering Corp.Mar 10, 2006
7,000
total depth, ft
4
permits on file
Mar 10, 2006
last permit issued
Aug 8, 1997
completed
23.1K
cumulative oil, bbl
96K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2010

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 8, 1997
Shut in
—
Plugged
Aug 2, 2010

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Garcia, J. A. G-4-166195Bloomberg (Frio 3900)Riddle Engineering Corp.10359Dec 1997 – Aug 2010
Garcia, J. A. et AL G-4-217035Bloomberg (Frio 5100)Riddle Engineering Corp.1030.7KFeb 2006 – Aug 2010
Garcia, J.A. O-4-12416Bloomberg, West (5500)Riddle Engineering Corp.123.1K13.8KDec 1994 – Dec 2007
Garcia, J. A. et AL G-4-99104Bloomberg (Vicksburg 6800)Mueller Engineering Corp.1051.1KJan 1993 – Dec 1994

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Mueller Engineering Corp.Jan 1993 → Jan 1998
  2. 2Riddle Engineering Corp.Feb 2006 → Sep 2008

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
615060-99RecompletionRiddle Engineering Corp.Mar 1, 2006Mar 10, 2006Feb 24, 20065,380
471839-99RecompletionMueller Engineering Corp.Jan 5, 1998Jan 6, 1998Dec 8, 19975,380
431308-99RecompletionMueller Engineering Corp.Dec 23, 1994Dec 28, 1994Nov 16, 19945,980
134623-99DrillHamilton Brothers Oil Co.Sep 28, 1981Sep 28, 1981Oct 14, 19817,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-99104————
—— G-4-166195————
—— G-4-217035————
—— O-4-12416————

Perforations

Perforated and open-hole intervals.

FromToType
3,9563,960Perforated
5,2265,234Perforated
5,2505,260Perforated
5,3345,538Perforated
5,5805,584Perforated
5,6205,624Perforated
6,8326,851Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,00014.75550 S
7.6255,8909.875605 S
7.6255,9809.875605 S
26,690——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 30, 2006Mar 14, 2006Yes
00Jul 12, 2006——
00May 19, 1998Jan 5, 1998Yes
00Feb 3, 1998——
00Oct 14, 1997Aug 26, 1997—
00Mar 16, 1995Dec 21, 1994Yes
00Jan 9, 1995——
00Jan 12, 1984Apr 14, 1982—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.