WELL · 42-215-31219 · DISTRICT 4

McAllen, A. A. #11

N

Hidalgo County  · Directional · Sidetrack

Mcallen, A. A. #11 (API 42-215-31219) is a permitted well in Hidalgo County filed by Totalfinaelf E&P USA Inc; no completion report is on file yet.

The RRC has issued 5 drilling permits (amended once) between 1982 and 2002, permitted to 16,700 ft.

Completion filings report 5 formation tops, including S Sand, Uv, Y, Lowce Y.

Operator of record

Totalfinaelf E&P USA Inc

Houston, TX · P-5 Y, filed Oct 10, 2003 · 138 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsOXY USA Inc.through Mar 2015
Latest permitTotalfinaelf E&P USA IncJun 25, 2002
16,700
total depth, ft
6
permits on file
Jun 25, 2002
last permit issued
—
completed
0
cumulative oil, bbl
3.81M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
McAllen, A. A. G-4-100473McAllen Ranch (Vicksburg Y)Merit Energy Company10667KJan 1993 – Jul 2026
McAllen, A. A. "Slot" G-4-191623McAllen Ranch (Vksbg P-V,s Cons)Merit Energy Company103.14MMay 2002 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Fina Oil & Chemical CompanyDec 2000 → Dec 2000
  2. 2Totalfinaelf E&P USA IncJan 2001 → Aug 2003
  3. 3Total E&P USA, Inc.Sep 2003 → Jan 2006
  4. 4Shell Western E&PFeb 2006 → Apr 2011
  5. 5OXY USA Inc.May 2011 → Mar 2015

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
521364-99Recompletion · sidetrackTotalfinaelf E&P USA IncJun 25, 2002Jun 25, 2002May 1, 200216,700
497571-98Recompletion · sidetrackTotalfinaelf E&P USA IncMar 5, 2002Aug 15, 2000Aug 2, 200016,700
497571-99Recompletion · sidetrackFina Oil & Chemical CompanyJul 24, 2000Aug 15, 2000—16,700
417767-99RecompletionFina Oil & Chemical CompanyNov 2, 1993Nov 10, 1993—16,700
389702-99RecompletionFina Oil & Chemical CompanyJul 8, 1991Jul 12, 1991—16,700
149682-99DrillTenneco Oil Co.Feb 2, 1982Feb 2, 1982Mar 6, 198216,700

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-100473————
—— G-4-191623————

Formation tops

As filed on W-2/G-1. Subsea from 182 ft elevation.Download CSV →

FormationMD ftSubsea
S Sand11,864-11,682
UV12,179-11,997
Y12,721-12,539
Lowce Y13,227-13,045
Lower Y13,227-13,045

Perforations

Perforated and open-hole intervals.

FromToType
12,23812,304Perforated
12,76112,859Perforated
12,77612,910Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3752,02517.52,100 S
9.6259,20012.25890 S
9.6259,20012.5890 S
7.62512,0308.5348 S
5.512,5406.5410 S
2.512,600——
5.513,5406.5410 S
3.513,5406.5350 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 26, 2003May 23, 2003—
00Jan 9, 2003Jul 22, 2002Yes
00Dec 4, 2002——
00Aug 29, 2002Mar 8, 2002Yes
00Jan 12, 1984Sep 7, 1982—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21531219, documented in the API reference.